Heavy Duty Balanced Opposed Compressors
Heavy Duty Balanced Opposed Compressors
Heavy Duty Balanced Opposed Compressors
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FOR MODELS: JG AND JGA SECTION 4 - LUBRICATION AND VENTING<br />
NOTE: BASE RATE REFERRED TO ABOVE IS AS FOLLOWS:<br />
0.3 PINTS/DAY/INCH BORE (0.0056 L/DAY/mm BORE) FOR JG AND JGA<br />
FRAMES.<br />
PISTON ROD DIAMETER IS DOUBLED AND TREATED LIKE A CYLINDER FOR<br />
CALCULATING PACKING LUBE RATE.<br />
CYLINDERS HAVE ONE POINT BORE LUBE AS STANDARD, EXCEPT FOR<br />
1-3/4JG-HE and 13-1/3JG CLASS CYLINDERS WHICH HAVE MULTI-PORT<br />
LUBE AS STANDARD. TOP AND BOTTOM BORE LUBE IS AVAILABLE AS AN<br />
ORIGINAL PURCHASE OPTION. PISTON ROD PACKINGS FOR HIGH-PRES-<br />
SURE CYLINDERS HAVE TWO POINT LUBE. FOR MULTIPLE LUBE POINTS,<br />
THE REQUIRED LUBRICANT FOR THE CYLINDER OR PACKING IS DIVIDED<br />
EQUALLY AMONG THE LUBE POINTS.<br />
BREAK-IN LUBE RATE SHOULD BE TWICE THE RECOMMENDED DAILY<br />
RATE (150% MINIMUM); I.E. THE BREAK-IN CYCLE TIME SHOULD BE<br />
APPROXIMATELY ONE-HALF THE NORMAL CYCLE TIME (67% MAXIMUM)<br />
TO INCREASE LUBE RATE. BREAK-IN RATE SHOULD BE MAINTAINED FOR<br />
200 HOURS OF OPERATION.<br />
THE RECOMMENDED LUBE RATES FOR BREAK-IN OR NORMAL OPERA-<br />
TION, IN CYCLES PER SECOND (AS STAMPED ON THE LUBRICATOR BOX<br />
INFORMATION PLATE), ARE CALCULATED AT MAXIMUM COMPRESSOR<br />
SPEED (AS STAMPED ON THE COMPRESSOR INFORMATION PLATE). THE<br />
LUBE RATE MAY BE REDUCED WITH SPEED, (AS COMPRESSOR SPEED IS<br />
REDUCED, CYCLE TIME INCREASES TO REDUCE LUBE RATE):<br />
(RPMMAX ÷ RPMRUNNING) x CYCLE TIME SECLUBE PLATE = CYCLE TIME SECRUNNING REFERENCE THE LUBRICATION SHEETS IN THE ARIEL “PARTS BOOK”<br />
FOR THE CYCLE TIME (SECONDS) VS. RPM (COMPRESSOR SPEED) TABLE<br />
AT VARIOUS RUNNING SPEEDS FOR YOUR UNIT, AT THE STATED GAS<br />
OPERATING CONDITIONS AND LUBRICANT.<br />
SPECIAL LUBRICANT FORMULATIONS ARE AVAILABLE FROM LUBRICANT<br />
SUPPLIERS FOR SPECIFIC APPLICATIONS. SUPPLIERS WHO WILL CER-<br />
TIFY SUITABILITY OF THE FORMULATION FOR SITE CONDITIONS SHOULD<br />
PROVIDE APPROPRIATE DOCUMENTATION. CONTACT ARIEL FOR VERIFI-<br />
CATION OF WARRANTY COVERAGE.<br />
PAGE 4 - 10 11/01