12.07.2015 Views

Fraser River Sockeye Fisheries and Fisheries Management - Cohen ...

Fraser River Sockeye Fisheries and Fisheries Management - Cohen ...

Fraser River Sockeye Fisheries and Fisheries Management - Cohen ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

All sectors3.7 The Contractor will describe <strong>and</strong> summarize the consequences of non-retentionfisheries (First Nations, commercial, recreational) on sockeye physiology,survival <strong>and</strong> abundance.<strong>Fisheries</strong> <strong>Management</strong>3.8 The Contractor will describe <strong>and</strong> evaluate the accuracy, precision <strong>and</strong> reliabilityof pre-season forecasting methods. This work will include a description of theapplication of pre-season forecasting in harvest management.3.9 The Contractor will also describe <strong>and</strong> evaluate the accuracy, precision <strong>and</strong>reliability of other methods, if any, that are available for pre-season forecastingnot historically or currently used by DFO <strong>and</strong> the Pacific Salmon Commission.3.10 The Contractor will describe <strong>and</strong> evaluate the accuracy, precision <strong>and</strong> reliabilityof in-season run-size abundance estimation methods. This work will include adescription of the application of in-season <strong>and</strong> post-season run-size abundanceestimation in harvest management.3.11 The Contractor will also describe <strong>and</strong> evaluate the accuracy, precision <strong>and</strong>reliability of other methods, if any, that are available for in-season <strong>and</strong> postseasonrun-size abundance estimation not historically or currently used by DFO<strong>and</strong> the PSC.3.12 The Contractor will describe <strong>and</strong> evaluate the accuracy, precision <strong>and</strong> reliabilityof in-season <strong>and</strong> post-season escapement enumeration methods used historically<strong>and</strong> currently by DFO <strong>and</strong> the PSC.3.13 The Contractor will also describe <strong>and</strong> evaluate the accuracy, precision <strong>and</strong>reliability of other methods, if any, that are available for enumerating sockeye nothistorically or currently used by DFO <strong>and</strong> the PSC.3.14 The Contractor will analyze historical performance of the in-season assessmentprocess, to include changes in estimates of in-season run sizes, with particularemphasis on how long it has taken within each season to correctly assess the finalin-season run size. The key issue to be described is how quickly the in-seasonassessment process can respond, to meet escapement goals.A-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!