12.07.2015 Views

surveying iii (topographic and geodetic surveys) - Modern Prepper

surveying iii (topographic and geodetic surveys) - Modern Prepper

surveying iii (topographic and geodetic surveys) - Modern Prepper

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11. The unit of graduation on a horizontal-circle reading is _________________________________.A. 4 minutesB. 2 secondsC. 1 secondE. 0.1 second12. One method of reading the minute value of the horizontal circle uses both the upper <strong>and</strong> lowercircles. If both circles are used, the number of divisions or graduations from the degree mark on thelower circle to the degree mark diametrically opposite (180°) on the upper circle, when_____________________, gives the value of minutesA. Divided by 2B. Divided by 4C. Multiplied by 2D. Multiplied by 413. What is the least desirable type of traverse?A. An open traverse closed on a known pointB. An open traverseC. A closed traverseD. A closed traverse on a starting point14. When using a 1-second theodolite, what angular closure per station is expected?A. 1 secondB. 5 secondsC. 10 secondsD. 20 secondsEN0593 3-38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!