12.07.2015 Views

surveying iii (topographic and geodetic surveys) - Modern Prepper

surveying iii (topographic and geodetic surveys) - Modern Prepper

surveying iii (topographic and geodetic surveys) - Modern Prepper

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

length or side is known, <strong>and</strong> all three angles are measured. The other lengths or sides of the triangles arecomputed by applying the law of sines (sin) (Figure 2-1).Figure 2-1. Solving Angles <strong>and</strong> Using the Law of Sinesb. To begin work on a net of triangulation, the length of the starting line is required. The finalcomputation of the positions of the new stations, as well as the final azimuths, is done after thetriangulation is complete from one line of known length to another <strong>and</strong> after the net has been adjusted.The azimuth, latitude, <strong>and</strong> longitude are obtained from astronomic observations made during or after thetriangulation observations.2-34. Classification of Triangulation. The basis of classification of triangulation is the accuracy withwhich the length <strong>and</strong> azimuth of a line of the triangulation are determined. Higher order triangulation isperformed under two primary orders of accuracy. These orders are subdivided to give a total of fivedifferent degrees of precision. The principal criterion is that the discrepancy between the measuredlength of a baseline <strong>and</strong> its length, as computed through the triangulation net from the next precedingbase, shall not, after adjustment, be greater than the length closure shown for each class.a. First-Order Triangulation. There are three classes of first-order triangulation. Class I <strong>surveys</strong> are the most precise class of survey <strong>and</strong> must have a length closure of 1 partin 100,000. Its use is generally restricted to <strong>surveys</strong> for scientific purpose. These includeestablishing <strong>and</strong> testing missile <strong>and</strong> satellite systems, <strong>and</strong> performing studies of the shiftingof the earth's crust <strong>and</strong> the tilting of l<strong>and</strong>masses. Class I is also the basis for accurate l<strong>and</strong><strong>surveys</strong> in highly developed areas. Class II must have a length closure of 1 part in 50,000. The basic national-control net shouldbe composed of arcs of triangulation of thisEN0593 2-18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!