12.07.2015 Views

surveying iii (topographic and geodetic surveys) - Modern Prepper

surveying iii (topographic and geodetic surveys) - Modern Prepper

surveying iii (topographic and geodetic surveys) - Modern Prepper

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

e an alphanumeric symbol that is stamped on the respective disk monument. The name that appears onthe control point for publication purposes should be the same as the name that actually appears on themonument. Old stations that are reestablished are given the previous name with a numerical suffixadded. In the absence of guidance from the customer, adhere to the following rules: Use the name of a nearby geographical feature. Use short names with a maximum of 25 characters, including spaces. Include the name of the agency or unit that set the monument if it is not precast. Make sure the station name is spelled correctly on all documents. Do not use special characters such as periods, commas, slashes, or equal signs. Do not include nondescriptive terms or personal names.2-51. L<strong>and</strong>owner Permission. Permission must be obtained before conducting a survey on any privatel<strong>and</strong>. The survey section sergeant or the party chief, working through the local Judge Advocate General(JAG), will contact <strong>and</strong> negotiate with l<strong>and</strong>owners for access to prospective station sites. Writtenpermission to enter the l<strong>and</strong> is preferred because it is documented. The local JAG will assist in thismatter <strong>and</strong> will help keep the military out of potential trouble.a. Survey L<strong>and</strong> Within the United States. Reconnaissance <strong>and</strong> survey parties should have a rightof-entryletter from their headquarters to enter a selected area. This letter does not entitle the surveyteam to access private property or restricted areas without further permission. When the l<strong>and</strong>owner iscontacted, a full explanation of the work to be done is given without any attempt to conceal anyinconveniences or damage that may arise. Government regulations concerning damage claims should beexplained. In the case of an absentee owner, a letter explaining the work <strong>and</strong> requesting consent toaccess the property should be mailed.b. Survey L<strong>and</strong> Outside of the United States. When working in other nations, the appropriateofficer of the US embassy within that country will generally negotiate the right-of-entry letters foroverall areas within that country. However, a right-of-entry letter or approval from the host nation is notalways sufficient for access to all public l<strong>and</strong>s within the national boundaries. It is sometimes necessaryto contact the local officials where the work is to be performed. Agreements will be conductedaccording to local customs. Some countries consider an oral agreement, or any statement that could beconstrued to be an oral agreement, to be contractual <strong>and</strong> binding. Any transfer of assets (material orotherwise) requires close coordination with the JAG.EN0593 2-28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!