12.07.2015 Views

Defining CCS Ready: An Approach to An International Definition

Defining CCS Ready: An Approach to An International Definition

Defining CCS Ready: An Approach to An International Definition

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Executive SummaryExhibit ES-3: Illustration of Graduated Levels of Requirements Common <strong>to</strong> aCO 2 Capture <strong>Ready</strong> Plant, a Transport <strong>Ready</strong> Plant, and a S<strong>to</strong>rage <strong>Ready</strong> PlantComponent <strong>CCS</strong> <strong>Ready</strong> Level 1 <strong>CCS</strong> <strong>Ready</strong> Level 2 <strong>CCS</strong> <strong>Ready</strong> Level 3Conflicting Usesand RightsCost Estimate for<strong>CCS</strong> FacilitiesEnvironmental,Safety, and OtherApprovalsPublic Awarenessand EngagementSources forEquipment,Materials, andServicesOngoingObligationsTransport: Identify any conflicting land use activity, as well as feasibility of land/portaccess.S<strong>to</strong>rage: Identify any conflicting surface and subsurface uses, as well as feasibility ofaccess <strong>to</strong> site(s).Capture: Prepare preliminary economicanalysis of capture facilities.Transport: Prepare preliminary economicanalysis for transport facilities, andestimate the cost of transportation for thecapture plant.S<strong>to</strong>rage: Prepare preliminary economicanalysis for s<strong>to</strong>rage facility includingcapital and operation and maintenancecosts, and estimate the cost of s<strong>to</strong>ragefor the capture plantCapture: Identify all approvals that willneed <strong>to</strong> be obtained for retrofitting capturefacilities.Transport: Identify all approvals that willneed <strong>to</strong> be obtained for transporting CO2.S<strong>to</strong>rage: Identify all approvals that willneed <strong>to</strong> be obtained for s<strong>to</strong>rage site.Capture: Notify public of eventual capturefacilities retrofit via web site and otheractions.Transport: Notify public of chosentransport method(s) and corridor(s) viaweb site and other actions.S<strong>to</strong>rage: Notify public of eventual s<strong>to</strong>ragesite via web site and other actionsNoneCapture: Prepare preliminary economicfeasibility study based on technicalfeasibility study.Transport: Conduct preliminary economicfeasibility study, based on technicalfeasibility study, including cost oftransportation for the capture plant.S<strong>to</strong>rage: Conduct preliminary economicfeasibility study based on technicalfeasibility study, including the cost ofs<strong>to</strong>rage for the capture plantCapture: Conduct feasibility studies forobtaining all approvals for retrofitting.Transport: Conduct feasibility studies forobtaining all approvals for transportationfacilities.S<strong>to</strong>rage: Conduct feasibility studies forobtaining all approvals for s<strong>to</strong>rage site.Capture: Seek public engagement inplanning of capture facilitiesTransport: Seek public engagement intransportation planning.S<strong>to</strong>rage: Seek public engagement ins<strong>to</strong>rage site planning.Capture: Compile list of companies whocan supply construction and operationservices <strong>to</strong> capture facilities.Transport: Compile list of companies whocan supply equipment, materials andservices needed for construction andoperation of CO2 transportation.S<strong>to</strong>rage: Compile list of companies whocan supply equipment, materials andservices needed for construction andoperation of s<strong>to</strong>rage siteCapture: File periodic reports with regula<strong>to</strong>rs on status of Capture <strong>Ready</strong>.Transport: File periodic reports with regula<strong>to</strong>rs on status of Transport <strong>Ready</strong>.S<strong>to</strong>rage: File periodic reports with regula<strong>to</strong>rs on status of S<strong>to</strong>rage <strong>Ready</strong>.Transport: Resolve any issueswith conflicting surface and subsurfaceuses, and land/port access.S<strong>to</strong>rage: Resolve any issues withconflicting surface and sub-surfaceuses, and site access.In addition <strong>to</strong> Level 2 requirement,prepare follow-on economicfeasibility study based on technicalinformation provided in DBM.Capture: Prepare key documentsfor obtaining all approvals.Transport: Prepare keydocuments for obtaining allapprovals for transportationfacilities.S<strong>to</strong>rage: Prepare key documentsfor obtaining all approvals fors<strong>to</strong>rage site.Capture: In addition <strong>to</strong> Level 2requirement, encourage publicengagement in approval process.Transport: In addition <strong>to</strong> Level 2requirement, encourage publicengagement in transportationapproval process.S<strong>to</strong>rage: In addition <strong>to</strong> Level 2requirement, encourage publicengagement in s<strong>to</strong>rage siteapproval process.Contact companies and negotiatenonbinding letters of intent <strong>to</strong> bidon project.Capture: In addition <strong>to</strong> Level 2requirement, respond <strong>to</strong> manda<strong>to</strong>rytrigger mechanism <strong>to</strong> retrofitcapture facilities.Transport: In addition <strong>to</strong> Level 2requirement, respond <strong>to</strong> manda<strong>to</strong>rytrigger mechanism <strong>to</strong> developtransport facilities.S<strong>to</strong>rage: In addition <strong>to</strong> Level 2requirement, respond <strong>to</strong> manda<strong>to</strong>rytrigger mechanism <strong>to</strong> develops<strong>to</strong>rage site for injection.23 February 2010 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!