12.07.2015 Views

Defining CCS Ready: An Approach to An International Definition

Defining CCS Ready: An Approach to An International Definition

Defining CCS Ready: An Approach to An International Definition

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 1: IntroductionDevelopers of capture-ready plants should take responsibility for ensuring that all known fac<strong>to</strong>rs intheir control that would prevent installation and operation of CO 2 capture have been eliminated.This might include:• A study of options for CO2 capture retrofit and potential pre-investments• Inclusion of sufficient space and access for the additional facilities that would be required• Identification of reasonable route(s) <strong>to</strong> s<strong>to</strong>rage of CO 2Competent authorities involved in permitting power plants should be provided with sufficientinformation <strong>to</strong> be able <strong>to</strong> judge whether the developer has met these criteria. 7In addition <strong>to</strong> the IEA GHG’s definition, other reports and publications have also addressedaspects of <strong>CCS</strong> <strong>Ready</strong> plants. Exhibit 1-1 summarizes the key concepts associated with <strong>CCS</strong><strong>Ready</strong> plants that are discussed in each document. Further detail on <strong>CCS</strong> <strong>Ready</strong> definitionsin the existing literature is provided in Appendix A.Exhibit 1-1: Summary of Documents with Concepts Includedin the <strong>CCS</strong> <strong>Ready</strong> <strong>Definition</strong>Author (Year)Type of PlantConcept Included in the <strong>CCS</strong> <strong>Ready</strong> <strong>Definition</strong>Blankinship, S. (2008). PC; IGCC; NGCC Bohm, M.C. (2007). PC; IGCC EPPSA.. (2006). Power Gibbins, J. (2006). PC; IGCC; NGCC IEA GHG. (2007b). PC; IGCC Irons, R. (2007). IGCC; NGCC Lucquiaud, M.. (2009). PC Markusson N. & Haszeldine, S. (2008). PC; IGCC; NGCC Minchener, A. (2007). PC; IGCC; NGCC Mott MacDonald Group. (2008). UMPPs Sekar, R.C. (2005). PC; IGCC Stephens, J.C. (2005). IGCC PC = Pulverized Coal; IGCC = Integrated Gasification Combined Cycle; NGCC = Natural Gas Combined Cycle; UMPP =Ultra-Mega Power PlantIn general, the existing literature mostly focuses on a Capture <strong>Ready</strong> plant and defines it asone that can retrofit and eventually capture CO 2 emissions once the appropriate drivers arein place. Some of the literature also mentions the need for identifying appropriate s<strong>to</strong>ragesites and transportation routes, but does not discuss these issues in detail.SpaceDesignEconomicPre-investmentCaptureTransportS<strong>to</strong>rage7 <strong>International</strong> Energy Agency Greenhouse Gas R&D Programme (IEA GHG). (2007a). CO2 capture ready plants (Reportno. 2007/4). Cheltenham, UK: Author.23 February 2010 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!