Chapter 1: IntroductionCO2 Capture <strong>Ready</strong> PlantExhibit 1-4: Illustration of Graduated Levels of Requirementsfor a CO 2 Capture <strong>Ready</strong> PlantComponent <strong>CCS</strong> <strong>Ready</strong> Level 1 <strong>CCS</strong> <strong>Ready</strong> Level 2 <strong>CCS</strong> <strong>Ready</strong> Level 3Plant site selectionTechnology SelectionDesign for CaptureFacilitiesSpace AllowanceEquipment Pre-investmentCost Estimate for CaptureFacilitiesEnvironmental, Safety, andOther Approvals forCapture FacilitiesPublic Awareness andEngagement Related <strong>to</strong>Capture FacilitiesSources for Equipment,Materials, and Services forCapture FacilitiesOngoing ObligationsLocate plant in a site where transportation <strong>to</strong> s<strong>to</strong>rage sites is potentially feasible.Identify one or more potentialcapture technologies.Prepare a preliminary design forcapture facilities and theirintegration in<strong>to</strong> the plant.Identify preferred capturetechnologies.Prepare technical feasibilitystudy for capture facilities andtheir integration.Identify chosen capturetechnology.In additional <strong>to</strong> Level 2requirement, prepare a DesignBasis Memorandum (DBM) forcapture facilities and theirintegration.Allow sufficient space, as determined by design studies, for needed equipment and constructionzone.Make little or no equipmentpre-investment.Prepare preliminary economicanalysis of capture facilities.Identify all approvals that willneed <strong>to</strong> be obtained forretrofitting capture facilities.Notify public of eventualcapture facilities retrofit viaweb site and other actions.None.Make modest level of equipmentpre-investment.Prepare preliminary economicfeasibility study based on technicalfeasibility study.Conduct feasibility studies forobtaining all approvals forretrofitting.Seek public engagement inplanning of capture facilities.Compile list of companies who cansupply construction and operationservices <strong>to</strong> capture facilities.File periodic reports with regula<strong>to</strong>rs on status of capture ready.Make high level of equipmentpre-investment.In addition <strong>to</strong> Level 2requirement, prepare follow-oneconomic feasibility studybased on technicalinformation provided in DBM.Prepare key documents forobtaining all approvals.In addition <strong>to</strong> Level 2requirement, encourage publicengagement in approvalprocess.Contact companies andnegotiate nonbinding letters ofintent <strong>to</strong> bid on project.In addition <strong>to</strong> Level 2requirement, respond <strong>to</strong>manda<strong>to</strong>ry trigger mechanism<strong>to</strong> retrofit capture facilities.Source: ICF <strong>International</strong>23 February 2010 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!