12.07.2015 Views

Defining CCS Ready: An Approach to An International Definition

Defining CCS Ready: An Approach to An International Definition

Defining CCS Ready: An Approach to An International Definition

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 4: S<strong>to</strong>rage <strong>Ready</strong> Plant <strong>Definition</strong>utility, has recently expressed concerns that public opposition <strong>to</strong> CO 2 s<strong>to</strong>rage in Germanymay force the company <strong>to</strong> instead build a coal plant with <strong>CCS</strong> in the Netherlands. 114 Asdiscussed in Section 2.3.4, there are many recommendations for improving awareness andengaging with the public. These issues are also valid for S<strong>to</strong>rage <strong>Ready</strong> plants.4.4.4 Equipment Sources, Materials, and Services for Future Injectionand S<strong>to</strong>rage OperationsA future <strong>CCS</strong> retrofit will likely require the <strong>CCS</strong> <strong>Ready</strong> plant owner <strong>to</strong> contract with acompany <strong>to</strong> construct and/or operate a CO 2 s<strong>to</strong>rage site. In order <strong>to</strong> make sure that suchs<strong>to</strong>rage services are potentially available, project developers can identify service vendors andassess whether they operate in the region or country(ies) where the selected s<strong>to</strong>rage islocated. As discussed in Section 2.4.4, identifying these vendors in advance will provide avariety of benefits, including the promotion of acquisition of business procurementagreements, building relationships, promoting knowledge sharing, and minimizing delays inobtaining equipment and services, at the time of retrofit..Exhibit 4-8 below lists the types of equipment for consideration by developers of CO 2s<strong>to</strong>rage sites. These types of equipment are generally the same as what would be needed foroil or gas field development.Exhibit 4-8: Key Equipment for Identifying, Constructing,and Operating a CO 2 S<strong>to</strong>rage SiteEquipment TypeInjection and moni<strong>to</strong>ring wellsFacilities and infrastructurePipelinesPumpsCompressorsProcess control equipmentElectrical SubstationMoni<strong>to</strong>ring equipment & servicesMiscellaneous systems andequipmentPurposeInjection wells drilled <strong>to</strong> inject CO2 in<strong>to</strong> the s<strong>to</strong>rage siteSurface facilities and or offshore platforms, jackets or subsea equipment will beneeded for s<strong>to</strong>rage sitesOnsite pipelines <strong>to</strong> transport CO2 from s<strong>to</strong>rage site fence line <strong>to</strong> injection wellsPumps <strong>to</strong> boost pressure of CO2 for injectionCompressors may be used in addition <strong>to</strong> pumps for injection of CO2 for EnhancedRecoveryFlow meters and other process instrumentation <strong>to</strong> measure and control flow rate,temperature, pressure, and composition of CO2 injected in<strong>to</strong> s<strong>to</strong>rage siteElectrical transformers and related equipment <strong>to</strong> supply electricity <strong>to</strong> pumps andother equipmentSurface and subsurface Moni<strong>to</strong>ring equipment <strong>to</strong> moni<strong>to</strong>r CO2 plumes and <strong>to</strong> detectmigration of CO2 injected from the s<strong>to</strong>rage sitePotable water wells, domestic wastewater treatment plant; operations andmaintenance buildings; emergency genera<strong>to</strong>rs, etc. <strong>to</strong> support site operations.Early consideration of the companies that provide these equipment and services will helpdevelopers determine their options. Options for eventual partnerships and commercialarrangements may include private contracts, aligning with other plant opera<strong>to</strong>rs <strong>to</strong> contractwith an oil and gas company <strong>to</strong> build and operate the s<strong>to</strong>rage site, or potentially workingwith a government corporation. Establishing a commercial arrangement with an existings<strong>to</strong>rage operation may also be an option for s<strong>to</strong>rage.114 Comfort, N.. (2010). RWE may build Dutch carbon capture plant amid German opposition.23 February 2010 65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!