12.07.2015 Views

Defining CCS Ready: An Approach to An International Definition

Defining CCS Ready: An Approach to An International Definition

Defining CCS Ready: An Approach to An International Definition

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CO2 S<strong>to</strong>rage <strong>Ready</strong> PlantExhibit 1-6: Illustration of Graduated Levels of Requirementsfor a CO 2 S<strong>to</strong>rage <strong>Ready</strong> PlantChapter 1: IntroductionComponent <strong>CCS</strong> <strong>Ready</strong> Level 1 <strong>CCS</strong> <strong>Ready</strong> Level 2 <strong>CCS</strong> <strong>Ready</strong> Level 3S<strong>to</strong>rage Site SelectionVerifying Injectivity,Capacity, and Integrityof S<strong>to</strong>rage SiteDesign of S<strong>to</strong>rageFacilityConflicting Uses andRightsCost Estimate forS<strong>to</strong>rage FacilityEnvironmental, Safety,and Other Approvalsfor S<strong>to</strong>rage SitePublic Awareness andEngagement Related<strong>to</strong> CO2 S<strong>to</strong>rage SiteSources forEquipment, Materials,and Services forS<strong>to</strong>rage SiteOngoing ObligationsEstimate <strong>to</strong>tal amount of CO2 <strong>to</strong> becaptured and s<strong>to</strong>red for all years of<strong>CCS</strong> operation of the plant, andidentify one or more feasibles<strong>to</strong>rage sites expected <strong>to</strong>accommodate the captured CO2.Review existing regionalprospectivity studies and showthat the required capacity istheoretically available; conductpreliminary assessment of s<strong>to</strong>rageintegrity and risks; and submit anoverall plan for site assessment.Prepare preliminary design fors<strong>to</strong>rage facility.In addition <strong>to</strong> Level 1requirement, obtain contractualoptions <strong>to</strong> one or moreappropriate s<strong>to</strong>rage sites.In addition <strong>to</strong> Level 1requirement, conduct desk<strong>to</strong>pstudy of injectivity, capacity,and integrity of s<strong>to</strong>ragelocation(s), and show that“effective” capacity isavailable.Identify any conflicting surface and subsurface uses, as well asfeasibility of access <strong>to</strong> site(s).Prepare preliminary economicanalysis for s<strong>to</strong>rage facility includingcapital and operation andmaintenance costs, and estimate thecost of s<strong>to</strong>rage for the capture plant.Identify all approvals that will need<strong>to</strong> be obtained for s<strong>to</strong>rage site.Notify public of eventual s<strong>to</strong>ragesite via web site and other actions.None.In addition <strong>to</strong> Level 2 requirement,obtain rights <strong>to</strong> one or moreappropriate s<strong>to</strong>rage sites.In addition <strong>to</strong> Level 2 requirement,conduct geological exploration <strong>to</strong>screen and select specific site(s) formore detailed characterization ofaquifers, or detailed assessment ofoil/gas options; estimate “practical”capacity and conduct initial modelingof long-term reservoir behavior; andprepare Detailed S<strong>to</strong>rage IntegrityRisk Assessment.Prepare technical feasibility In additional <strong>to</strong> Level 2 requirement,study for s<strong>to</strong>rage facility, prepare a Design Basis Memorandumincluding preliminary moni<strong>to</strong>ring (DBM) for s<strong>to</strong>rage site facility, includingand verification plan. moni<strong>to</strong>ring and verification plan.Conduct preliminaryeconomic feasibility studybased on technical feasibilitystudy, including the cost ofs<strong>to</strong>rage for the capture plant.Conduct feasibility studies forobtaining all approvals fors<strong>to</strong>rage site.Seek public engagement ins<strong>to</strong>rage site planning.Compile list of companies whocan supply equipment,materials and servicesneeded for construction andoperation of s<strong>to</strong>rage site.File periodic reports with regula<strong>to</strong>rs on status of s<strong>to</strong>rage ready.Resolve any issues with conflictingsurface and sub-surface uses, andsite access.In addition <strong>to</strong> Level 2 requirement,prepare follow-on economic feasibilitystudy based on technicalinformation provided in DBM.Prepare key documents for obtainingall approvals for s<strong>to</strong>rage site.In addition <strong>to</strong> Level 2 requirement,encourage public engagement ins<strong>to</strong>rage site approval process.Contact companies and negotiatenonbinding letters of intent <strong>to</strong> bid onproject.In addition <strong>to</strong> Level 2 requirement,respond <strong>to</strong> manda<strong>to</strong>ry triggermechanism <strong>to</strong> develop s<strong>to</strong>rage sitefor injection.Source: ICF <strong>International</strong>23 February 2010 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!