13.07.2015 Views

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SASKPOWER</strong> <strong>OPEN</strong> <strong>ACCESS</strong> <strong>TRANSMISSION</strong> <strong>TARIFF</strong>Specifications For Long-Term Firm Point-To-Point Transmission ServiceOASIS Reference Number: ________________Page 4 of 5l.0 Term of Transaction: __________________________________Start Date: ___________________________________________Termination Date: _____________________________________2.0 Description of capacity and energy to be transmitted by Transmission Providerincluding the electric Control Area in which the transaction originates._______________________________________________________3.0 Point(s) of Receipt:___________________________________Delivering Party:______________________________________4.0 Point(s) of Delivery:__________________________________Receiving Party:_______________________________________5.0 Maximum amount of capacity and energy to be transmitted (ReservedCapacity):___________________________________6.0 Designation of party(ies) subject to reciprocal service obligation: _____7.0 Name(s) of any Intervening Systems providing transmissionservice:________________________________________________________________________________________________________Page | 104

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!