13.07.2015 Views

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SASKPOWER</strong> <strong>OPEN</strong> <strong>ACCESS</strong> <strong>TRANSMISSION</strong> <strong>TARIFF</strong>(e)(f)(g)(h)(i)(j)(k)(l)(m)Network Load at each point designated in Section 4 of the Specifications ForNetwork Integration Transmission Service attached to the Service Agreement;Regulation and Frequency Response requirement;Spinning or Supplemental Reserve from each Network Resource;Spinning or Supplemental Reserve purchase from SaskPower or each third party;The Transmission Customer's most severe single contingency;Available capacity from each Network Resource;Transmission Service associated with each pre-schedule and forecast;Incremental and decremental cost data for Network Resources; andOther information, as required by SaskPower.13.3. Annual Forecast - By [insert date] of each year, the Transmission Customer shall updateits load and resource forecast by providing SaskPower with a non-binding forecast in aformat specified by SaskPower.13.4. Monthly Forecast – [insert number] days before the end of the month, the TransmissionCustomer shall update the forecast for the following month specifying purchase,generation, maximum demand, total monthly energy and Operating Reserve Servicesfrom SaskPower or a third party.13.5. The Transmission Customer shall telemeter to SaskPower information including but notlimited to watts, VArs, generator status, generator breaker status, generator terminalvoltage and high side transformer voltage, unless otherwise agreed.13.6. The Transmission Customer shall provide generating resource characteristics toSaskPower as necessary to implement re-dispatch and constraint and reservemanagement.14. Metering14.1. Unless otherwise agreed the Transmission Customer shall be responsible for the cost ofinstalling and maintaining revenue meters and communication equipment compatiblewith SaskPower's meter reading system and facility standards. Revenue quality meteringequipment and meters shall be installed at the high voltage bus at each point ofinterconnection between the Transmission Customer's facility and SaskPower's system.The meters shall measure and record both real power (watts) and reactive power (VArs)flow and line losses, if applicable, in both directions. Meters not installed at the highvoltage bus or at the point of interconnection shall be adjusted for losses.Page | 132

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!