13.07.2015 Views

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SASKPOWER</strong> <strong>OPEN</strong> <strong>ACCESS</strong> <strong>TRANSMISSION</strong> <strong>TARIFF</strong>Studies shall consider simultaneous transfers on interfaces and prior scheduled equipmentoutages.System Performance Criteria for Simulation StudiesThe study criteria consider thermal, stability, and voltage limits. The criteria are based onmeeting NERC Planning Standard IA with provision to phase out the Coteau Creek InitiatedLoadshed Scheme. SaskPower applies the performance criteria as follows:1. With normal steady state (pre-contingency) operating procedures in effect, all facilityloadings shall be within SaskPower normal equipment ratings and all transmission systemswitching station voltages shall be within SaskPower normal limits.2. Following contingencies, all facility loadings shall be within SaskPower emergencyequipment ratings and all transmission system switching station voltages shall be withinSaskPower post-contingency limits.3. Following contingencies, transient voltages at transmission system switching stationsshall meet the criteria defined in the MAPP Reliability Handbook.4. Following contingencies, generator dynamic power angle swing damping shall meet thecriteria defined in the MAPP Reliability Handbook.5. Following contingencies and after the operation of any automatic systems, alltransmission facility loadings shall be within SaskPower emergency ratings and allPage | 118

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!