13.07.2015 Views

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SASKPOWER OPEN ACCESS TRANSMISSION TARIFF

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SASKPOWER</strong> <strong>OPEN</strong> <strong>ACCESS</strong> <strong>TRANSMISSION</strong> <strong>TARIFF</strong>5. Regulation and Frequency ResponseThe Transmission Customer shall meet its proportional share of Regulating Margin byeither:(a)(b)Purchasing Regulation and Frequency Response Services from SaskPowerpursuant to Schedule 3; orContributing or arranging to have a third party contribute generating resources tomeet the Regulating Margin requirement for the current year as follows:Regulating Margin Requirement = Transmission Customer's maximum NetworkLoad in the previous year x 1.7%A Transmission Customer that meets its proportional share of Regulating Margin byalternative (b) above shall also meet the requirements of Section 16 below.6. Operating Reserve6.1. The Transmission Customer shall meet its share of its Control Area’s Operating Reserverequirements by either:(a) Purchasing Operating Reserve Services from SaskPower pursuant to Schedules 5and 6; or(b)Providing or arranging to have a third party provide the Operating Reserverequirement.A Transmission Customer that meets its share of its Control Area’s Operating Reserverequirement by alternative (b) above shall also meet the requirements of Section 16below. The Operating Reserve requirement is as specified and implemented bySaskPower.6.2. In order to facilitate the use of Operating Reserve, the Transmission Customer that meetsits share of its Control Area’s Operating Reserve requirement by alternative 6.1(b) shallhave available unloaded reserved Firm transmission capacity at least equal to thatOperating Reserve amount. Such transmission may be loaded with interruptible energy sothat, upon interruption of the energy, Transmission Service is available to replace suchenergy from the Operating Reserve.In addition, the Transmission Customer shall restore Operating Reserve to the requiredlevel as promptly as practicable, but shall not exceed sixty (60) minutes from the time ofthe event necessitating the loading of the reserve.Page | 127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!