13.07.2015 Views

Untitled - Adif

Untitled - Adif

Untitled - Adif

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NETWORK STATEMENT 2008. UPDATEThe definition of Additional, Supplementaryand Ancillary Services is given in Chapter 6,section 6.3.4 of this document.5.2. ACCESS SERVICES TO RAILWAYLINES ON THE ADIF MANAGEDNETWORKAuthorised RUs and Candidates will be entitledto receive the minimum access package inequal conditions, as laid down in Art. 5.1 ofDirective 2001/14/EC. More specifically,Candidates will be entitled to:BASIC INFORMATION• Obtain a copy of the NS, in the stipulatedconditions.• Obtain the regulatory documents and theTrain Timetable by the most suitable means,for the parts that affect them.• Consult Timetable projects through theMALLAS application.• Consult Timetable projects through the SIGESapplication.101CAPACITY ALLOCATION• Request Capacity Allocation through theSIPSOR tool, or any means recognised inthis NS.5.3. TRACK ACCESS TO FACILITIESAND SUPPLY OF SERVICES• Request Capacity from the OSS on othernetworks, as well as ADIF, within the RNE.• Receive answers from Capacity allocationrequests via SIPSOR, or any meansrecognised in this NS.USE OF INFRASTRUCTURE5.3.1. USE OF ELECTRICAL SUPPLYFOR TRACTION CURRENTThis Additional Service involves the availabilityof voltage on lines that have suitable Facilitiesfor providing this service. Consult file SC-8in Supplementary Services and see Map 7in Annex G.• Use Infrastructure Capacity allocated.• ADIF will control train operations.• Receive support and information in incidentmanagement.5.3.2. REFUELLING FACILITIESThis Additional Service involves the supply offuel at those Stations or Terminals with suitablefacilities for providing the above. Consult fileSC-9 in Supplementary Services and see Map14 in Annex G.ADIF SERVICES05

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!