13.07.2015 Views

Untitled - Adif

Untitled - Adif

Untitled - Adif

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NETWORK STATEMENT 2008. UPDATEC. Modernisation and improvement work hasmade it possible to increase speed onseveral lines and sections, in particular:CONVENTIONAL GAUGE NETWORKZARAGOZA – SAGUNTO LINE: themaximum speed has been increasedto 200 km/h on 94.1 kmALCÁZAR DE SAN JUAN – CÁDIZLINE: Jerez – Puerto de Santa MaríaSection: 14.6 km with maximumspeed of 200 km/hLLEIDA – L’HOSPITALET DE LLOBREGATLINE: Cervera – Calaf 26.7 kmSection, its maximum speed changesto 160 km/hMálaga – Málaga Junction Section,2.1 km of single track due to work onthe new Madrid – Córdoba – MálagaHigh Speed Line.Bellvitge Switch 672.9 – BarcelonaCan Tunis Section, (1,5 km) andBellvitge Switch 671.9 – BarcelonaMorrot, (6.3 km), both double track,replaced by the new Llobregat Junction– Barcelona Can Tunis access.Lleida Changer – Lleida Switch 3.1Changer Section: 0.9 km of singletrack.Zaragoza Delicias Switch Km 338.1-– La Almozara Section, 0.7 km ofsingle track.73CIUDAD REAL – BADAJOZ LINE:Castuera – Guareña 50.6 km Section,the maximum speed has increasedfrom 140 km/h to 160 km/h3.9.3.4. SECTIONS OUT OF SERVICECONVENTIONAL GAUGE NETWORKThe following sections have been takenout of service and dismantled, whereappropriate:Madrid Chamartín – FuencarralFuente Grande Section, 3.2 kmof single track due to work on thenew Madrid Chamartín – ValladolidCampo Grande AV Line.INFRASTRUCTURE03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!