- Page 1:
Carrier-to-Carrier GuidelinesPerfor
- Page 4 and 5:
PR-6 INSTALLATION QUALITY..........
- Page 6 and 7:
GE-2-01 % OF ACCESS REQUEST RESPONS
- Page 8 and 9:
INTRODUCTIONThis section of the Ver
- Page 10 and 11:
URL ReferencesVerizon references UR
- Page 12 and 13:
GENERAL NOTESVerizon North includes
- Page 14 and 15:
Retail Analog Compare Table, contin
- Page 16 and 17:
Sub-CodeProduct2200 Resale Specials
- Page 18 and 19:
Sub-Code6000 Systems MetricsProduct
- Page 20 and 21:
Function:PO-1 Response Time OSS Pre
- Page 22 and 23:
Formula:∑ Response Times for each
- Page 24 and 25:
Function:PO-2 OSS Interface Availab
- Page 26 and 27:
PO-2 Formula:(Number of hours sched
- Page 28 and 29:
Report DimensionsCompany:• CLEC A
- Page 30 and 31:
Change Management Notifications sen
- Page 32 and 33:
Function:PO-6 Software ValidationDe
- Page 34 and 35:
Report Dimensions:Company:• CLEC
- Page 36 and 37:
Section 2Ordering Performance(OR)OR
- Page 38 and 39:
OR-1 Definition, continued:Notes:(1
- Page 40 and 41:
Report Dimensions:Company:• CLEC
- Page 42 and 43:
Sub-Metrics OR-1 Order Confirmation
- Page 44 and 45:
Function:OR-2 Reject TimelinessDefi
- Page 46 and 47:
Performance Standard - Reject Timel
- Page 48 and 49:
Sub-Metrics - OR-2 Reject Timelines
- Page 50 and 51:
Function:Definition:Exclusions:•P
- Page 52 and 53:
Sub-Metrics Timeliness of Completio
- Page 54 and 55:
Function:OR-6 Order AccuracyDefinit
- Page 56 and 57:
OR-6-04 % Accuracy - Directory List
- Page 58 and 59:
Function:Definition:Exclusions:Repo
- Page 60 and 61:
Function:OR-10 PON Notifier Excepti
- Page 62 and 63:
Function:OR-11 Timeliness of Provid
- Page 64 and 65:
Function:OR-13 % of Large Job Hot C
- Page 66 and 67:
Function:PR-1 Average Interval Offe
- Page 68 and 69: Sub-Metrics - PR-1 Average Interval
- Page 70 and 71: Function:PR-3 Completed within Spec
- Page 72 and 73: Sub-Metrics PR-3 % Completed within
- Page 74 and 75: Report Dimensions:Company:• CLEC
- Page 76 and 77: Sub-Metrics (continued) PR-4 Missed
- Page 78 and 79: Function:PR-5 Facility Missed Order
- Page 80 and 81: Sub-Metrics (continued) Facility Mi
- Page 82 and 83: Sub-MetricsPR-6-01 % Installation T
- Page 84 and 85: Sub-MetricsPR-8-01 Percent Open Ord
- Page 86 and 87: Definition.Note: For all types of H
- Page 88 and 89: Sub-Metrics - Hot Cut Loops, contin
- Page 90 and 91: Function:MR-1 Response Time OSS Mai
- Page 92 and 93: Sub-MetricsMR-1-01Average Response
- Page 94 and 95: Function:MR-2 Trouble Report RateDe
- Page 96 and 97: •MR-2-05Products% CPE/TOK/FOK/NPC
- Page 98 and 99: Sub-MetricsMR-3-01 % Missed Repair
- Page 100 and 101: Exclusions:• Troubles reported on
- Page 102 and 103: Sub-Metrics - Trouble Duration Inte
- Page 104 and 105: Function:MR-5 Repeat Trouble Report
- Page 106 and 107: Section 5Network Performance(NP)NP-
- Page 108 and 109: Report Dimensions - NP-1 Percent Fi
- Page 110 and 111: Report Dimensions:Company:• CLEC
- Page 112: Function:NP-6 NXX Updates (Applicab
- Page 115 and 116: Function:BI-2 Timeliness of Carrier
- Page 117: Definition, continuedClosure• A c
- Page 121 and 122: Function:BI - 6 Completeness of Usa
- Page 123 and 124: Function:BI - 8 Non-Recurring Charg
- Page 125 and 126: Section 7Operator Services & Direct
- Page 127 and 128: Function:OD-3 DA Database Update Ac
- Page 129 and 130: General (GE)Function:GE-1 Directory
- Page 131 and 132: Function:GE-3 Bona Fide Request Res
- Page 133 and 134: Report Dimensions:Company:• CLEC
- Page 135 and 136: GlossaryApplication DateASRVZ Admin
- Page 137 and 138: Cut-Over WindowDedicated FinalTrunk
- Page 139 and 140: 2-Wire Digital This service provide
- Page 141 and 142: RejectRun ClockSegmentSOPSpecial Se
- Page 143 and 144: Product identification descriptions
- Page 145: Implementation process for the East