13.07.2015 Views

Carrier-to-Carrier Guidelines Ver.17 - Verizon

Carrier-to-Carrier Guidelines Ver.17 - Verizon

Carrier-to-Carrier Guidelines Ver.17 - Verizon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sub-Metrics OR-1 Order Confirmation Timeliness (continued)•OR-1-12 % On Time FOC 9Products Trunks:• Interconnection Trunks (CLEC) (≤ 192 Forecasted Trunks)• Interconnection Trunks (CLEC) (> 192 and Unforecasted Trunks and Projects)Calculation Numera<strong>to</strong>r Denomina<strong>to</strong>rNumber of orders confirmed within thespecified interval for the product type.Number of orders received (electronicallyand faxed) confirmed by product type.OR-1-13 % On Time Design Layout Record (DLR)Products Trunks:• Interconnection Trunks (CLEC)Calculation Numera<strong>to</strong>r Denomina<strong>to</strong>rNumber of DLRs completed on or before Number of DLRs completed.DLRD date in TIRKS.OR-1-19 % On Time Response - Request for Inbound Augment TrunksNote: This metric is a combined measure including both; denied TGSRs that have a seven (7)-dayperformance standard, and accepted TGSRs that have a 10-day performance standard.Products • <strong>Verizon</strong> Inbound Augment Trunks (≤ 192 Trunks)• <strong>Verizon</strong> Inbound Augment Trunks (>192 Trunks)Calculation Numera<strong>to</strong>r Denomina<strong>to</strong>rNumber of requests for InboundAugment Trunks with responses sentwithin the specified interval for producttype.Number of requests for Inbound AugmentTrunks requested on a TGSR received viae-mail.9 For OR-1-12, <strong>Verizon</strong> measures the confirmation on the last ASR PON version receivedVZEAST201003-NY200909Version 17.043

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!