13.07.2015 Views

Carrier-to-Carrier Guidelines Ver.17 - Verizon

Carrier-to-Carrier Guidelines Ver.17 - Verizon

Carrier-to-Carrier Guidelines Ver.17 - Verizon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Function:PR-6 Installation QualityDefinition:This metric measures the percent of lines/circuits/trunks installed where a reported trouble was found inthe <strong>Verizon</strong> network within 30 days of order completion. Any additional trouble received after the initial I-code is closed out, and is within the specified time period (7 or 30 days) is counted as a repeater.For sub-metric PR-6-03 only, the UNE POTS Loop Total product includes UNE Loop Hot Cuts.The PR-6 sub-metric calculations for the report month include Orders that are complete in the billingsystem. (Orders that are not billing completed in the report month are not included in the PR-6calculations). Note: This does not apply <strong>to</strong> Hot Cuts and Interconnection Trunks (CLEC) which arecalculated based on physical work completion.Trunks: Includes reciprocal trunks from VZ <strong>to</strong> CLEC.Note: For POTS services, the percent of lines/circuits/trunks installed where a reported trouble wasfound in the network within seven (7) days. This includes Disposition Codes 03 (Drop Wire), 04 (Cable)and 05 (Central Office). Disposition Code 05 includes translation troubles au<strong>to</strong>matically cleared viaSwitch <strong>to</strong> Order Compare (STORC) for <strong>Verizon</strong> North and SERVICE for <strong>Verizon</strong> Mid-Atlantic (or othersimilar record verification system utilized by <strong>Verizon</strong>) by CLEC. The source system: NMP-Mai.Exclusions:• Subsequent reports (additional cus<strong>to</strong>mer calls while the trouble is pending).• Troubles closed due <strong>to</strong> cus<strong>to</strong>mer action.• Troubles reported by <strong>Verizon</strong> employees in the course of performing preventative maintenance,where no cus<strong>to</strong>mer has reported a trouble.• Special Project PONs (if applicable) per the process documented in Appendix S.Formula:Installation Troubles (within seven (7) or 30 days) with Disposition Codes 03, 04 and 05 divided by Linescompleted multiplied by 100.Performance Standard:PR-6-01: Parity with VZ Retail For Found TroublesPR-6-02: % Installation Troubles Reported within seven (7) Days: 2%PR-6-03: No standardReport DimensionsCompany:• CLEC Aggregate• CLEC SpecificGeography:• State SpecificVZEAST201003-NY200909Version 17.081

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!