13.07.2015 Views

TM9-2330-202-14&P - JATONKAM35s HOME ON THE WEB

TM9-2330-202-14&P - JATONKAM35s HOME ON THE WEB

TM9-2330-202-14&P - JATONKAM35s HOME ON THE WEB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TM 9-<strong>2330</strong>-<strong>202</strong>-14&P4-33. HANDBRAKE LEVER AND LINKAGE REPLACEMENT (C<strong>ON</strong>TINUED).438-069NOTEConfiguration varies. If installing new cable and U-bolt, perform steps 5.1 and 5.2.5.1. Drill two new 5/16 inch holes (11.4) 1 inch apart and 1 inch behind existing mounting holes in frameside.NOTEAlign U-bolt in groove of cable end.5.2. Install U-bolt (11.3), two new lockwashers (11.2), and nuts (11.1).6. Install spacer plate (10), cable assembly (3), and retaining strap (9) on frame (11) with two machinescrews (8) and new self-locking nuts (7).7. Repeat steps 1 through 6 for installation of other handbrake lever and linkage.438-015FOLLOW-<strong>ON</strong> TASKS:• Install hub and brakedrum (para 4-43).• Install wheel and tire assembly (para 4-44).• Lubricate handbrake lever and linkage (Appendix I).• Adjust handbrakes (para 4-34).Change 2 4-53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!