13.07.2015 Views

TM9-2330-202-14&P - JATONKAM35s HOME ON THE WEB

TM9-2330-202-14&P - JATONKAM35s HOME ON THE WEB

TM9-2330-202-14&P - JATONKAM35s HOME ON THE WEB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TM 9-<strong>2330</strong>-<strong>202</strong>-14&P2-11. INSTALLING RACK, TAILGATE, AND CANVAS COVER ASSEMBLIES (M101 A2 AND M101A3) (continued).i. At rear of trailer, align two strap hinge assemblies (11) on tailgate assembly (12) with two hinges (13) on road- sideside rack assembly (1).j. Install two straight headed pins (14), with heads facing up, in two strap hinge assemblies (11) and hinges (13).Install two cotter pins (15) in two straight-headed pins (14).k. At curb side, repeat steps i and j to install curb-side tailgate assembly (16) on curb-side side rack assembly (1).I. Close both tailgate assemblies (12 and 16).m. Install connecting link (17) in two top strap latch assemblies (18) of both tailgate assemblies (12 and 16).n. Install two connecting links (19) in two bottom strap latch assemblies (20) on both tailgate assemblies (12 and 16)and two holes in cargo body (2).oAlign one of five bow assemblies (21) with twostakes (4) in both side rack assemblies (1)Push bow assembly (21) evenly into stakes(4) until fully installed in side rack assemblies(1).p. Repeat step o to install remaining four bowassemblies (21).2-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!