13.07.2015 Views

THE RUDOLF REPORT

THE RUDOLF REPORT

THE RUDOLF REPORT

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GERMAR <strong>RUDOLF</strong> · <strong>THE</strong> <strong>RUDOLF</strong> <strong>REPORT</strong>Fig. 46: Alleged Zyklon B introduction hole in the roof of morgue 1 (‘gaschamber’) of crematorium II in December 1991. It is clearly visible that it wasnot cleared from the steel reinforcement rods. These were simply bentbackwards.lengthy dry season. Large parts of the masonry work and concrete ceilingaccessible there are in original condition, protected from wind andweather. There are no visible signs of erosion or corrosion. In his book,Pressac shows illustrations of the circular, intact ventilation pipe openingsthrough the ceiling of morgue 2 of crematorium II as well asthrough the concrete ceiling of the oven room of crematorium III. 255Figs. 49-53 (p. 126) show the five openings in the ceiling of theoven room of crematorium III as of December 1991. They were usedto withdraw radiant heat from the crematorium ovens. The ceiling collapsedduring the demolition of the oven room and most of the fiveholes were partially destroyed during the process.If the Zyklon B introduction holes described by eyewitnessesreally existed, with the wire mesh columns installed inside them, thenwhat else is to be expected?1. According to eyewitness Henryk Tauber, the victims wouldhave demolished all the equipment in this room: 256255 J.-C. Pressac, op. cit. (note 67), pp. 365f.256 Ibid., pp. 483f.; Pelt Report, op. cit. (note 66), p. 106.122

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!