13.07.2015 Views

Alibre Design

Alibre Design

Alibre Design

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 13 - Bills of Material‣ To link a BOM to a drawing:1. From the Tools menu, select Bill of Materials > Link; or in the Drawing Explorer,right-click the drawing name and select Link Bill of Materials from the pop-upmenu. The Bill of Materials dialog box appears.2. To link a new BOM, select the New Bill of Materials option. Specify theStandard Template or Custom Template option, and select a size or templateaccordingly. Click Browse to select the applicable design.3. To link an existing BOM, select the Existing Bill of Materials option.4. Click Browse. The Choose <strong>Design</strong> Part or Assembly dialog box appears.5. In the Document Browser, navigate to the location of the BOM.6. Select the applicable BOM in the item list.7. Click OK. The BOM name appears in the Bill of Materials dialog box.8. Click OK. The BOM item appears in the Drawing Explorer under the drawing name.You can insert callout balloons after the BOM has been linked to the drawing.13.3.3 Unlinking a BOM from a DrawingUnlinking a BOM from a drawing removes all association between the BOM and drawing.If the BOM view has been inserted into the sheet, unlinking a BOM will delete the BOMview from the sheet automatically.411

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!