SECTION 3 - BOLTED JOIST AT COLUMN (FLANGE / WEB)<br />

SECTION 1 - STANDARD SHOE<br />

2<br />

90 mm (3 1/2”) MIN. FOR 100 mm (4”) SHOE (TYP.)<br />

TOP OF SLAB<br />

21 x 32 mm ( 13/16” x 1 1 /4”) SLOTS @ 125 mm (5”) C/C (HAMBRO SHOE)<br />

21 mm ( 13/16”) Ø HOLES @ 125 mm (5”) C/C (SUPPORT)<br />

65 mm (2 1 /2”)<br />

TOP CHORD<br />

WELDED WIRE-MESH<br />

SLAB<br />

(T)<br />

NOMINAL<br />

JOIST DEPTH SLAB<br />

(D) (T)<br />

100 mm<br />

(4”)<br />

100 mm<br />

(4î)<br />

6 mm ( 1 /4”)<br />

45 mm (1 3/4”)<br />

CEILING EXTENSION<br />

TOP OF BEARING<br />

T+ 6 mm ( 1 /4”)<br />

TYPICAL DETAILS<br />

STEEL COLUMN, ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER (U.N.O)<br />

FIRST DIAGONAL<br />

- T+ 6 mm ( 1/4”) = SLAB THICKNESS + SHOE THICKNESS<br />

- SHOE WIDTH = 190 mm (7 1 /2”)<br />

SECTION 4 - BOLTED JOISTS AT BEAM<br />

SECTION 2 - STANDARD SHOE /MINI-JOIST<br />

203 mm (8”) FLANGE BETWEEN 254 mm (10”) TO 303 mm (11<br />

230 mm (9”) FLANGE OF 305 mm (12”) AND MORE<br />

7/8”)<br />

152 mm (6”) FLANGE BETWEEN 230 mm (9”) TO 252 mm (9 7/8”)<br />

127 mm (5”) FLANGE BETWEEN 190 mm (7 1/2”) TO 228 mm (8 7/8”)<br />

102 mm (4”) FLANGE BETWEEN 152 mm (6”) TO 188 mm (7 3/8”)<br />

70 mm (2 3/4”) FLANGE BETWEEN 127 mm (5”) TO 150 mm (5 7/8”)<br />

58 mm (2 1/4”) FLANGE BETWEEN 100 mm (4”) TO 125 mm (4 7/8”)<br />

21 x 32 mm ( 13/16” x 1 1 /4”) SLOTS<br />

@ 125 mm (5”) C/C (HAMBRO SHOE)<br />

21 mm ( 13 /16”) Ø HOLES<br />

@ 125 mm (5”) C/C (SUPPORT)<br />

90 mm (3 1/2”) MIN. FOR 100 mm (4”) SHOE (TYP.)<br />

WELDED WIRE-MESH<br />

SLAB<br />

(T)<br />

WELDED WIRE-MESH<br />

NOMINAL<br />

JOIST DEPTH SLAB<br />

(D) (T)<br />

NOMINAL<br />

JOIST DEPTH<br />

(D)<br />

MINI JOIST<br />

CEILING EXTENSION<br />

TOP OF BEARING<br />

T + 6 mm ( 1 /4”)<br />

SOLID MASONRY WALL,<br />

ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER<br />

(FILL THE MASONRY BLOCK WITH MORTAR,<br />

UNDER THE JOIST SHOE)<br />

REBAR<br />

(IF REQUIRED BY<br />

CEILING EXTENSION<br />

T+ 6 mm ( 1 /4”)<br />

CEILING EXTENSION<br />

TOP OF BEARING<br />

THE CONSULTING ENGINEER)<br />

STEEL BEAM, ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER (U.N.O)<br />

T + 6 mm ( 1 /4”) = SLAB THICKNESS + SHOE THICKNESS<br />

T + 6 mm (1/4”) = SLAB THICKNESS + SHOE THICKNESS