MEP-Technical Manual CDN 0408.qxd - Hambro
MEP-Technical Manual CDN 0408.qxd - Hambro
MEP-Technical Manual CDN 0408.qxd - Hambro
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8.3 DTC (LH SERIES)<br />
TYPICAL DETAILS<br />
SECTION NO. DESCRIPTION PAGE<br />
1 Standard Shoe<br />
2 Bolted Joists at Steel Beam<br />
3 Bolted Joist at Column (Flange / Web)<br />
4 Joist Bearing on Steel Beam<br />
5 Minimum Clearance for Openings and Holes in the Slab<br />
6 Joist Parallel to a Steel Beam<br />
7 Thicker Slab<br />
8 Flange Hanger for Steel Beam and Wall<br />
9 Flange Hanger for Insulated Concrete Form<br />
10 Maximum LH Duct Openings<br />
11 Joist Parallel to a Concrete Wall With Insulated Form<br />
12 Joist Bearing on Concrete Wall With Insulated Form<br />
}<br />
} }<br />
}<br />
.................................................. 24<br />
.................................................. 25<br />
.............................................. 26<br />
.............................................. 27<br />
23