MEP-Technical Manual CDN 0408.qxd - Hambro
MEP-Technical Manual CDN 0408.qxd - Hambro
MEP-Technical Manual CDN 0408.qxd - Hambro
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8.2 MD2000 ® SERIES<br />
TYPICAL DETAILS<br />
SECTION NO. DESCRIPTION PAGE<br />
1 Standard Shoe<br />
2 Bolted Joist at Steel Column (Flange / Web)<br />
3 Bolted Joist at Steel Beam<br />
4 Joist Bearing on Masonry or Concrete Wall<br />
5 Joists Bearing on Masonry or Concrete Wall<br />
6 Joist Bearing on Concrete Wall With Insulated Form<br />
7 Joists Bearing on Concrete Wall With Insulated Form<br />
8 Joist Bearing on Steel Beam<br />
9 Joists Bearing on Steel Beam<br />
10 Joist Bearing on Steel Stud Wall<br />
11 Joists Bearing on Steel Stud Wall<br />
12 Joist Bearing on a Wood Stud<br />
13 Joists Bearing on Wood Stud Wall<br />
14 Expansion Joint at Intermediate Floors (at Masonry Wall)<br />
15 Expansion Joint at Roof (at Masonry Wall)<br />
16 Expansion Joint at Floors (at Steel Beam)<br />
17 Expansion Joint at Roof (at Steel Beam)<br />
18 Minimum Clearance for Opening and Hole in the Slab<br />
19 Joist Parallel to Expansion Joint<br />
20 Joist Parallel to a Masonry Wall or Concrete Wall<br />
21 Joist Parallel to a Concrete Wall with Insulated Form<br />
22 Joist Parallel to a Steel Beam<br />
23 Joist Parallel to a Steel Stud Wall<br />
24 Joist Parallel to a Wood Wall<br />
.............................................. 14<br />
.............................................. 15<br />
.............................................. 16<br />
.............................................. 17<br />
.............................................. 18<br />
.............................................. 19<br />
25 Thicker Slab<br />
}<br />
26 Header Support .............................................. 20<br />
27 Cantilevered Balcony (Joist Perpendicular to Balcony)<br />
28 Cantilevered Balcony (Shallow Joist Parallel to Balcony)<br />
29 Cantilevered Balcony (Joist Parallel to Balcony)<br />
.............................................. 21<br />
30 Maximum Duct Openings ............................................................................................................... 22<br />
}<br />
}<br />
}<br />
}<br />
}<br />
}<br />
}<br />
13