04.12.2012 Views

MEP-Technical Manual CDN 0408.qxd - Hambro

MEP-Technical Manual CDN 0408.qxd - Hambro

MEP-Technical Manual CDN 0408.qxd - Hambro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 15 - JOISTS BEARING ON A WOOD STUD WALL<br />

SECTION 13 - JOIST BEARING ON AN EXTERIOR STEEL STUD WALL<br />

90 mm (3 1 /2”) MIN. FOR 100 mm (4”) SHOE (TYP.)<br />

90 mm (3 1 /2”) MIN. FOR 100 mm (4”) SHOE (TYP.)<br />

JOIST SHOE ANCHORED TO PLANK<br />

WITH SCREWS OR NAILS<br />

WELDED WIRE-MESH<br />

40 mm (1<br />

WELDED WIRE-MESH<br />

1 /2”)<br />

5 mm ( 3/16”)<br />

SLAB<br />

(T)<br />

(T)<br />

SLAB<br />

(D)<br />

NOMINAL<br />

JOIST DEPTH<br />

(D)<br />

CEILING EXTENSION<br />

CEILING EXTENSION<br />

TOP OF BEARING<br />

T + 6 mm ( 1 /4”)<br />

NOMINAL<br />

JOIST DEPTH<br />

TOP OF BEARING<br />

T + 6 mm ( 1 /4”)<br />

TYPICAL DETAILS<br />

THE WOOD WALL AND THE TOP PLATE<br />

CAPACITY, ACCORDING TO THE<br />

SPECIFICATIONS OF THE<br />

CONSULTING ENGINEER<br />

NOTE; STAGGERED JOISTS<br />

CEILING EXTENSION<br />

THE METAL STUD AND THE TOP PLATE CAPACITY,<br />

ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER<br />

T + 6 mm ( 1 /4”) = SLAB THICKNESS + SHOE THICKNESS<br />

T + 6 mm ( 1/4”) = SLAB THICKNESS + SHOE THICKNESS<br />

SECTION 16 - EXPANSION JOINT AT INTERMEDIATE FLOOR (MASONRY WALL)<br />

SECTION 14 - JOIST BEARING ON A WOOD STUD WALL<br />

ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER<br />

90 mm (3 1 /2”) MIN. FOR 100 mm (4”) SHOE (TYP.)<br />

FIBRE BOARD 12 mm ( 1 /2”)<br />

DO NOT WELD THE SHOE ON THE ANGLE<br />

ANGLE ANCHORED TO THE MASONRY<br />

WALL ACCORDING TO THE<br />

SPECIFICATIONS OF THE<br />

CONSULTING ENGINEER<br />

JOIST SHOE ANCHORED TO PLANK WITH SCREWS OR NAILS<br />

WELDED WIRE-MESH<br />

WELDED WIRE-MESH<br />

(D) (T)<br />

SLAB<br />

T + 6 mm (<br />

TOP OF BEARING<br />

1/4”)<br />

NOMINAL<br />

JOIST DEPTH SLAB<br />

(D) (T)<br />

REBAR (IF REQUIRED BY THE<br />

CONSULTING ENGINEER)<br />

NOMINAL<br />

JOIST DEPTH<br />

TOP OF BEARING<br />

T + 6 mm ( 1/4”)<br />

CEILING EXTENSION<br />

SUPPORT ANGLE, ACCORDING TO THE<br />

SPECIFICATIONS OF THE CONSULTING ENGINEER.<br />

SOLID MASONRY WALL,<br />

ACCORDING TO THE<br />

SPECIFICATIONS OF THE<br />

CONSULTING ENGINEER<br />

CEILING EXTENSION<br />

TEMPORARY SUPPORT UNDER EACH JOIST AND<br />

EACH END UNTIL ALL FLOORS HAVE BEEN POURED.<br />

(PROVIDED AND DESIGNED BY OTHERS)<br />

THE WOOD WALL AND THE TOP PLATE CAPACITY,<br />

ACCORDING TO THE SPECIFICATIONS OF THE CONSULTING ENGINEER<br />

T + 6 mm ( 1 /4”) = SLAB THICKNESS + SHOE THICKNESS<br />

T + 6 mm ( 1 /4”) = SLAB THICKNESS + SHOE THICKNESS<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!