SECTION 15 - EXPANSION JOINT AT ROOF (AT MASONRY WALL)<br />

SECTION 13 - JOISTS BEARING ON WOOD STUD WALL<br />

FIBRE BOARD 12 mm (<br />

DO NOT WELD THE SHOE<br />

ON THE EMBEDED MATERIAL<br />

STEEL DECK<br />

1/2”)<br />

90 mm (3 1/2”) MIN. FOR 100 mm (4”) SHOE (TYP.)<br />

12 mm ( 1 /2”)Ø ROD x 600 mm (24”)<br />

@ 600 mm (24”) c/c.<br />

GREASE OR WRAP THIS END<br />

OF ROD WITH BUILDING PAPER<br />

SHOE ANCHORED TO THE PLANK<br />

WITH SCREWS OR NAILS<br />

90 mm (3 1/2”) MIN. FOR 100 mm (4”) SHOE (TYP.)<br />

NOMINAL<br />

SLAB<br />

(T)<br />

STEEL DECK<br />

WELDED WIRE-MESH<br />

NOMINAL<br />

SLAB<br />

(T)<br />

WELDED WIRE-MESH<br />

TOTAL<br />

SLAB<br />

NOMINAL<br />

JOIST DEPTH<br />

(D)<br />

T + 38 mm (1 1 /2”)<br />

TOP OF BEARING<br />

NOMINAL<br />

JOIST DEPTH<br />

(D) TOTAL<br />

SLAB<br />

T + 38 mm (1 1/2”)<br />

TOP OF BEARING<br />

TYPICAL DETAILS<br />

CEILING EXTENSION<br />

SOLID MASONRY WALL,<br />

ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER<br />

(FILL THE MASONRY BLOCK WITH MORTAR,<br />

UNDER THE HAMBRO SHOE)<br />

CEILING EXTENSION<br />

CEILING EXTENSION<br />

CEILING EXTENSION<br />

REBAR<br />

(IF REQUIRED BY THE<br />

CONSULTING ENGINEER<br />

THE WOOD WALL AND THE TOP PLATE<br />

CAPACITY, ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER<br />

NOTE: STAGGERED JOIST<br />

SECTION 16 - EXPANSION JOINT AT FLOORS (AT STEEL BEAM)<br />

SECTION 14 - EXPANSION JOINT AT INTERMEDIATE FLOORS<br />

(AT MASONRY WALL)<br />

40 mm<br />

OR<br />

1 5 mm<br />

1 /2”<br />

3 /16”<br />

ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER<br />

ANGLE ANCHORED TO<br />

THE MASONRY WALL, ACCORDING<br />

TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER<br />

NOMINAL<br />

SLAB<br />

(T)<br />

FIBRE BOARD 12 mm (<br />

DO NOT WELD THE<br />

SHOE ON THE ANGLE<br />

STEEL DECK<br />

1/2”)<br />

65 mm (2 1 /2”) MIN. FOR 75 mm (3”)<br />

OR 100 mm (4”) SHOE (TYP.)<br />

WELDED WIRE-MESH<br />

NOMINAL<br />

SLAB<br />

(T)<br />

FIBRE BOARD 12 mm (<br />

STEEL DECK<br />

1/2”)<br />

DO NOT WELD THE SHOE<br />

ON THE ANGLE<br />

WELDED WIRE-MESH<br />

TOTAL<br />

SLAB<br />

SLAB<br />

NOMINAL<br />

JOIST DEPTH<br />

(D)<br />

T + 38 mm (1 1 /2”)<br />

TOP OF BEARING<br />

T + 38 mm (1 1 /2”)<br />

TOP OF BEARING<br />

NOMINAL<br />

JOIST DEPTH<br />

(D) TOTAL<br />

REBAR<br />

(IF REQUIRED BY THE<br />

CONSULTING ENGINEER)<br />

CEILING EXTENSION<br />

STIFFENER (IF REQUIRED)<br />

CEILING EXTENSION<br />

CEILING EXTENSION<br />

SUPPORT ANGLE, ACCORDING TO THE<br />

SPECIFICATIONS OF THE CONSULTING ENGINEER<br />

STEEL BEAM, ACCORDING TO<br />

THE SPECIFICATIONS OF THE<br />

CONSULTING ENGINEER (U.N.O)<br />

SUPPORT ANGLE, ACCORDING TO THE<br />

SPECIFICATIONS OF THE CONSULTING ENGINEER<br />

TEMPORARY SUPPORT UNDER EACH JOIST AND<br />

EACH END UNTIL ALL FLOORS HAVE BEEN POURED<br />

(PROVIDED AND DESIGNED BY OTHERS)<br />

SOLID MASONRY WALL,<br />

ACCORDING TO THE SPECIFICATIONS<br />

OF THE CONSULTING ENGINEER<br />

17