27.08.2015 Views

Carriers

Plastic Cable Carriers

Plastic Cable Carriers

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Technical Data - QUANTUM-Series<br />

Type Q060<br />

Divider systems<br />

for Stay variant “RS“<br />

The divider system can be planned by you or by our engineers on the<br />

basis of the information you supply about the configuration of the<br />

cable carrier.<br />

As standard, the divider system is fitted on every frame stay (with stay<br />

assembly on every 6th pitch division).<br />

Divider system TS 0<br />

without height subdivision<br />

s T = 3 mm<br />

a T min = 13.5 mm<br />

a x min = 13 mm<br />

38<br />

Please state the number of<br />

dividers/cross section n T when ordering.<br />

Sample order:<br />

Divider system TS 0/n T 4<br />

s<br />

a a T<br />

T x a T<br />

B i<br />

The dividers can slide along the chain cross section!<br />

KR<br />

Divider system TS 1<br />

with continuous height subdivision<br />

Height subdivision: Al-Profile 11 x 4 mm<br />

Technically recommended variant: VD 1<br />

The dividers can slide along the chain cross section!<br />

s T = 3 mm<br />

a T min = 13.5 mm<br />

a T max = 40 mm<br />

a x min = 13 mm<br />

n T min = 2<br />

Please state the type of height subdivision<br />

and the number of dividers/cross<br />

section n T when ordering.<br />

Sample order:<br />

Divider system TS 1 – VD 1/n T 4<br />

a T<br />

VD 1<br />

17<br />

2<br />

1<br />

3<br />

a<br />

s T x a T<br />

B i<br />

17<br />

VD 2<br />

24.5 9.5<br />

VD 3<br />

24.5<br />

9.5<br />

VD 23<br />

9.5 11 9.5<br />

KR<br />

15<br />

Position of the<br />

sub-division(s)<br />

in the divider<br />

Divider system TS 2<br />

with grid subdivision (1 mm grid)<br />

Height subdivision: Al-Profile 11 x 4 mm<br />

Technically recommended variants: VD 0 and VD 1<br />

Dividers fixed by height subdivision, the grids can slide along<br />

the chain cross section!<br />

s T = 6 mm<br />

a T min = 13.5 mm<br />

a x min = 13mm(with height subdivision)<br />

a x min = 13 mm (at VR 0)<br />

a x grid = Continuous<br />

n T min = 2<br />

Please indicate the cavities (from left to<br />

right), the relevant subdivision variant<br />

and the assembly spacing a T and a x<br />

when ordering.<br />

Sample order: Divider system TS 2<br />

K(cavity) 1- VR 0 / 20 mm<br />

K 2 - VR 1 / 50 mm<br />

K 3 - VR 0 / 60 mm<br />

K 4 - VR 1 / 40 mm<br />

K 5 - VR 0 / 20 mm<br />

VR 0<br />

38<br />

a TL<br />

VR 1 VR 2 VR 3 VR 23<br />

17 17<br />

9.5<br />

9.5 24.5<br />

9.5<br />

2<br />

1<br />

3<br />

s<br />

a T<br />

Position of the<br />

x1 ax2 a TR<br />

sub-division(s)<br />

B i in the divider<br />

24.5<br />

11<br />

9.5<br />

VR 0<br />

38<br />

KR<br />

15<br />

4.08 Subject to technical changes! QUANTUM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!