09.10.2015 Views

OS-C501

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Offshore Standard DNV-<strong>OS</strong>-<strong>C501</strong>, November 2013<br />

Sec.1 General – Page 17<br />

3.3.6 The third party verifier should verify that the design documentation is according to the requirements of<br />

Sec.2 [5].<br />

4 Normative references<br />

The latest revision of the following documents applies:<br />

4.1 Offshore service specifications<br />

DNV-<strong>OS</strong>S-301<br />

4.2 Offshore Standards<br />

DNV-<strong>OS</strong>-F101<br />

DNV-<strong>OS</strong>-F201<br />

DNV-<strong>OS</strong>-C105<br />

DNV-<strong>OS</strong>-C106<br />

DNV-<strong>OS</strong>-<strong>C501</strong><br />

4.3 Recommended practices<br />

DNV-RP-B401<br />

DNV-RP-C203<br />

DNV-RP-C205<br />

DNV-RP-F101<br />

DNV-RP-F104<br />

DNV-RP-F105<br />

DNV-RP-F106<br />

DNV-RP-F108<br />

DNV-RP-F201<br />

DNV-RP-F202<br />

DNV-RP-O501<br />

4.4 Rules<br />

Certification and Verification of Pipelines<br />

Submarine Pipeline Systems<br />

Dynamic Risers<br />

Structural Design of TLPs by the LRFD Method<br />

Structural Design of Deep Draught Floating Units<br />

Composite Components<br />

Cathodic Protection Design<br />

Fatigue Strength<br />

Environmental Conditions and Environmental Loads<br />

Corroded Pipelines<br />

Mechanical Pipeline Couplings<br />

Free Spanning Pipelines<br />

Factory applied Pipeline Coatings for Corrosion Control (under development)<br />

Fracture Control for Reeling of Pipelines (under development)<br />

Titanium Risers<br />

Composite Risers<br />

Erosive Wear in Piping Systems<br />

DNV Rules for Certification of Flexible Risers and Pipes<br />

DNV Rules for Planning and Execution of Marine operations<br />

DNV Rules for Classification of Fixed Offshore Installations<br />

4.5 Standards for certification and classification notes<br />

DNV CN 1.2<br />

DNV CN 7<br />

DNV CN 30.2<br />

DNV CN 30.4<br />

DNV CN 30.6<br />

4.6 Other references<br />

API RP1111<br />

API RP2RD<br />

ISO/FDIS 2394<br />

IS0/CD 13628-7<br />

Method of analysis (App.J):<br />

Conformity Certification Services, Type Approval<br />

Ultrasonic Inspection of Weld Connections<br />

Fatigue Strength Analysis for Mobile Offshore Units<br />

Foundations<br />

Structural Reliability Analysis of Marine Structures<br />

Design, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines<br />

(Limit State Design)<br />

Design of Risers for Floating Production Systems (FPSs) and Tension-Leg Platforms<br />

(TLPs)<br />

General Principles on Reliability for Structures<br />

Petroleum and natural gas industries - Design and operation of subsea production systems<br />

- Part 7: Completion/workover riser systems<br />

— Ronold, K. and Lotsberg, I.: On the Estimation of Characteristic S-N curves with Confidence. Marine<br />

Structures, vol. 27, 2012, pp. 29-44.<br />

Guidance note:<br />

The latest revision of the DNV documents may be found in the publication list at the DNV website www.dnv.com.<br />

---e-n-d---of---G-u-i-d-a-n-c-e---n-o-t-e---<br />

DET NORSKE VERITAS AS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!