29.04.2019 Views

OS6860(E)_AOS_8.1.1.R01_Switch_Management_Guide

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Managing A Virtual Chassis<br />

Configuring Virtual Chassis<br />

For more information on using the lowest MAC address to determine the Master switch in a VC, refer to<br />

the diagram below:<br />

1<br />

A group of four switches are connected using the dedicated<br />

VFL ports. All switches are powered on within approximately<br />

2 minutes of each other. In addition, there is no<br />

vcsetup.cfg file on any of the switches.<br />

00:d0:95:b2:3c:8e<br />

00:d0:95:b2:2a:ab<br />

00:d0:95:b2:1c:ff<br />

00:d0:95:b2:5b:8d<br />

2<br />

When the chassis are booted, system software detects the<br />

lowest MAC address. In this example configuration, the<br />

lowest MAC address is 00:d0:95:b2:1c:ff. It is assigned<br />

chassid-id 1 and becomes the Master.<br />

Chassis-id 4 - Slave<br />

Chassis-id 3 - Slave<br />

Chassis-id 1 - Master<br />

Chassis-id 2 - Slave<br />

3<br />

The system software configures the remaining chassis as<br />

Slaves and assigns the next numerical chassis-id based on<br />

its VFL connection to the Master. This chassis-id information<br />

is saved to the vcsetup.cfg file, located in the<br />

switch’s /flash file directory.<br />

Automatic Master/Slave and Chassis-id Assignment<br />

:<br />

Chassis-id 1- Master<br />

Chassis-id 2- Slave<br />

1<br />

A virtual chassis of three switches is already up and running.<br />

A new switch is added to the VFL connections and powered<br />

on.<br />

Chassis-id 3- Slave<br />

Chassis-id 1- Master<br />

Chassis-id 2- Slave<br />

The new switch gets assigned the next available chassis-id<br />

and joins the virtual chassis.<br />

Chassis-id 3- Slave<br />

Chassis-id 4 - Slave<br />

Adding A New <strong>Switch</strong> to Existing Virtual Chassis<br />

page 13-10 Omni<strong>Switch</strong> <strong>AOS</strong> Release 8 <strong>Switch</strong> <strong>Management</strong> <strong>Guide</strong> May 2014

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!