04.11.2019 Views

SHRP-A-379 traducir

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V - Gmm-G"b xlO0<br />

a G mm<br />

5.12 Calculate the percent of voids filled with asphalt binder (VFA) as a portion of<br />

the voids in the mineral aggregate by the following equation:<br />

VMA-V<br />

VFA -<br />

VMA<br />

a x 100<br />

6. REPORT<br />

6.1 Report specific gravity results to the nearest 0.001 and percent voids (VMA, Va<br />

and VFA) to the nearest 0.1.<br />

237

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!