Table 7. Time Estimate for Level 2 Mix Design<br />

Procedure or Test Method Number of Tests Number of Time Oars)<br />

per Temperature Temperatures<br />

Compaction and Preparation of Six - - 4<br />

Specimens<br />

Bonding to Platens and Mounting of - - 1<br />

LVDT Screws<br />

Repetitive Shear at Constant Stress 2 1 3<br />

Ratio<br />

Frequency Sweep 2 1 2<br />

Simple Shear 2 1 1<br />

Data Preparation - - 2<br />

Temperature Changes - - 2<br />

Total Hours: 15<br />

Table 8. Testing Schedule for a Level 2 Mix Design<br />

Activity<br />

Time Period<br />

• Compact specimens and cut parallel faces. Days 1 through 3<br />

• Measure specimen dimensions and specific<br />

gravities.<br />

• Set up equipment and calibrate measurement<br />

devices.<br />

• Bond specimens to platens and mount LVDT<br />

screws.<br />

• Run repeated shear test (constant stress ratio) at Day 4<br />

T_u(PD).<br />

• Run frequency sweep and simple shear tests at am of Day 5<br />

To_(FC).<br />

• Run frequency sweep and simple shear tests at pm of Day 5<br />

T_(PD).<br />

• Preparation of data files for analysis in am of Day 6<br />

SUPERPAVE ® software.<br />

10. REPORT<br />

10.1 Report all test results as computer files compatible with and readable by the<br />

SUPERPAVE ® Specification, Mix Design and Support Program.<br />