May, Wii<br />

chain blocks are being installed on all f<strong>org</strong>ing machines.<br />

Eighteen Ajax hot saw and burring machines,<br />

one for each f<strong>org</strong>ing machine, are provided for cutting<br />

off the stock and smoothing the f<strong>org</strong>ings.<br />

No Accumulation of Scrap Permitted.<br />

No unnecessary scrap or material is allowed to<br />

accumulate around the machines, thus adding to the<br />

comfort of the workmen, which is reflected in increased<br />

production. Scrap buckets are placed at each<br />

producing unit for the accumulation of butt ends and<br />

scrap. These are also designed to fit the electric truck<br />

transportation and after they are filled, are taken out,<br />

picked up by the gantry crane and deposited in the<br />

scrap storage bins located at the north end of the stock<br />

yard. The scrap material is loaded into freight cars<br />

from these bins by the use of an electric magnet in connection<br />

with the gantry crane.<br />

The heating furnaces, Fig. 5, are oil fired and were<br />

constructed by the American F<strong>org</strong>e Company, each<br />

furnace being designed especially for the particular<br />

type of work it is to handle. Considerable experimenting<br />

was done in order to select an oil burner that<br />

would produce a soft mellow flame so necessary to<br />

insure thorough penetration of heat in the stock. The<br />

Anthony Nebulyte burner was found to be the most<br />

satisfactory in this respect, and the absence of a sharp<br />

cutting flame greatly prolongs the life of the furnace<br />

linings. Hydraulic pressed brick is used exclusively<br />

for the heating furnaces.<br />

Oil Fuel Used Exclusively.<br />

Oil is used throughout for fuel, the storage facilities<br />

consisting of three 50,000 gallon concrete lined underground<br />

tanks. All tanks are equipped with steam<br />

heated coils to insure free circulation of oil to the<br />

pumps. The oil, after being pumped from the underground<br />

tanks is run through a pre-heater and heated<br />

to approximately 180 deg. before delivery to the main<br />

supply line. Oil is delivered to the burners at a constant<br />

pressure of 40 pounds regardless of the number<br />

of furnaces in operation, the pressure being controlled<br />

by an automatic regulator developed by the American<br />

F<strong>org</strong>e Company. Twin pumps, motor driven, are pro-<br />

FIG. 8 (Right)—A corner in<br />

the finishing department<br />

showing a battery of motor<br />

driven grinders. Box cars<br />

on depressed track shown<br />

in the background.<br />

f<strong>org</strong>ing- Stamping - Heat Tieating<br />

FIG. 7—Electric trucks are used throughout the plant for<br />

material handling.<br />

151<br />

vided to guard against shutdown. The oil pumps and<br />

preheater are located in the boiler room.<br />

Air for the furnaces is supplied at a pressure of<br />

two pounds by two General Electric direct motor<br />

driven turbo compressors. These compressors are<br />

connected to a common main so that either one or both<br />

can be used depending upon requirements. Steam is<br />

used for atomizing the fuel oil for the heating furnaces.<br />

Trench Eliminates Overhead Obstructions.<br />

A concrete lined trench for accommodating the oil,<br />

air, steam, water and power lines removes all overhead<br />

obstructions and provides a free crane runway. The<br />

entire shop is served by a 10-ton Niles electric crane.<br />

The rough f<strong>org</strong>ings, after being cut from the bar<br />

stock, are burred and placed in Roura tote boxes and<br />

transported by electric truck to the grinding and inspection<br />

department, Fig. 6, which is located in building<br />

No. 2 just each of the main f<strong>org</strong>e shop. A 10-ft.<br />

space between the two buildings provides adequate<br />

lisrht and ventilation.<br />

FIG. 9 (Left)—Four car type<br />

furnaces are provided for<br />

heat treating.<br />

FIG. 10 (Center)—After heat<br />

treating the f<strong>org</strong>ings are<br />

tumbled to remove scale.