14.09.2023 Aufrufe

Filmakademie Baden-Württemberg Campus Magazin 23/24

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

in Europe‘s largest virtual production studio, the Hyperbowl<br />

in Penzing, 50 kilometres west of Munich. In<br />

four days, the elaborate set was built up under high pressure<br />

and then, after over 30 shots had been filmed, taken<br />

down again. This demanded highly efficient and concentrated<br />

work from the 50-strong team, who quickly<br />

got to grips with each other. In the LED studio we also<br />

shot a transition in which the sunset mountain panorama<br />

darkens and the surroundings around the mountain<br />

plateau turn into a foggy and cold landscape. Here, the<br />

use of virtual production technology and the in-camera<br />

captured light and environment changes reduced the<br />

VFX effort considerably.<br />

A few days later we faced the next hurdle: The set of<br />

the dojo ruin, which had been dismantled under high<br />

pressure, including the floor, was shipped from Penzing<br />

to Ludwigsburg and then had to be rebuilt identically<br />

in the Albrecht-Ade sound stage. There we wanted to<br />

capture the fight scene plot within the darkened world<br />

in a second shooting block. At the beginning of February,<br />

this second shooting block took place in Ludwigsburg<br />

and the previously choreographed and rehearsed<br />

fight scenes were shot. The basic atmosphere was created<br />

with the help of fog and foam particles. Inspired<br />

by anime productions, wirework (a special effects technique<br />

in which actors hang from ropes and seem to fly<br />

during fight scenes) was also used. In some scenes, it<br />

was to support the movements of the stunt performers<br />

beyond the natural level. In this shooting block, too, we<br />

managed to shoot all the scenes without any accidents or<br />

delay despite the tight schedule and complex fight choreographies.<br />

Particular attention was paid to seamlessly<br />

integrate the transition previously shot in the LED studio<br />

with appropriate lighting and atmosphere.<br />

Now that the demanding shooting and editing phase has<br />

been successfully completed, the sound, music and grading<br />

will be added in autumn 20<strong>23</strong>. The VFX scenes will<br />

be completed by December so that the project is finished<br />

by the end of the year and can be submitted to festivals<br />

in 20<strong>24</strong>.<br />

As the director, I would like to thank the entire team<br />

for their strong and professional effort, as well as the<br />

Animationsinstitut and the lecturers and mentors for<br />

their great support, which made the realization of this<br />

challenging short story possible.<br />

by Matthias Schaudig<br />

103

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!