03.03.2013 Views

Accutorr Plus Service Manual - Mindray

Accutorr Plus Service Manual - Mindray

Accutorr Plus Service Manual - Mindray

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.5.13 Verification of <strong>Accutorr</strong> <strong>Plus</strong> Pneumatic Performance,<br />

Using the “Cufflink” NIBP Emulator (11d) .........7-11<br />

7.5.14 Over Pressure Transducer Verification (12c, 12a, 12b) . 7-12<br />

7.5.15 Main Pressure Transducer Calibration. .............7-12<br />

7.5.16 Over Pressure Transducer Calibration ..............7-13<br />

7.5.17 Battery Selection (13) ..........................7-13<br />

7.6 Predictive Thermometer Verification and Calibration. .........7-14<br />

7.6.1 Temperature Accuracy Verification with the<br />

Predictive Temperature Simulator ................7-14<br />

7.6.2 Water Bath Method ...........................7-15<br />

7.6.3 System Calibration Procedure ....................7-15<br />

7.6.4 Temperature Verification Test, Infrared<br />

Thermometer ................................7-16<br />

7.6.5 Low Battery Sensing ...........................7-17<br />

7.7 Battery Test for <strong>Accutorr</strong> <strong>Plus</strong> ...........................7-18<br />

7.7.1 Low Battery Indicator and Low Battery Cut-Off ......7-18<br />

7.7.2 Set the Current Time ..........................7-19<br />

7.8 NIBP Normal Operation ...............................7-20<br />

7.9 Trend Memory Initialization ............................7-21<br />

7.10 SpO2 Normal Operation (<strong>Accutorr</strong> <strong>Plus</strong> with SpO2 only) .......7-21<br />

8.0 PREVENTIVE MAINTENANCE .......................8-1<br />

8.1 Introduction.........................................8-1<br />

8.2 Limitations of Physiological Simulators ....................8-1<br />

8.3 Preventive Maintenance Schedule .........................8-2<br />

8.3.1 Mechanical and Physical Visual Inspection<br />

(One Year Interval) ............................8-2<br />

8.3.2 Electrical Safety and Performance Checks<br />

(One Year Interval) ............................8-2<br />

<strong>Accutorr</strong> <strong>Plus</strong> <strong>Service</strong> <strong>Manual</strong> Revised 09/20/07<br />

vii<br />

Introduction

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!