Balloch Field Development <strong>Environmental</strong> <strong>Statement</strong><br />
Appendix A – Review of Legislation<br />
The Secretary of State considers any representations and issues authorisation.<br />
The PWA process addresses the requirements for DEPCON (Deposits Consent) required under the Petroleum Act 1998.<br />
The DISCON (Discharge Consent) has now been replaced by the requirement to get a permit (with a PON 15c) under the<br />
OCR 2002.<br />
Model Clauses of Authorisation In the Submarine Pipeline Works Authorisation (PWA) the Secretary of State for Energy and Climate Change will<br />
authorise the project to construct and to use the submarine pipelines and associated equipment, subject to a number of<br />
terms and conditions, including;<br />
The pipeline shall be used only for the transport of condensate, not of oil;<br />
The pipeline shall be constructed, installed and subsequently maintained in conformity with the plans,<br />
specifications and other information furnished by the project;<br />
The pipeline shall be used and operated in accordance with the requirements and shall be maintained in a<br />
proper state of repair and any damage to the pipeline shall be properly acted upon.<br />
The project shall ensure that there is insurance cover in order to enable liability to third parties caused by the<br />
release or escape of any of the contents of the pipelines.<br />
The pipelines shall be installed so that they will not impede or prevent the laying of further pipelines or cables;<br />
Those sections of the pipelines that are to be trenched shall be lowered into the subsoil as soon as practicable<br />
following pipe laying so that wherever practicable the uppermost surface of the pipelines is below the<br />
undisturbed level of the surrounding seabed;<br />
If any part of these sections of the pipelines above the level of the seabed causes actual interference with<br />
fishing or with other activities the Secretary of State may require that part of the pipelines should be lowered<br />
below the level of the surrounding seabed by trenching;<br />
Any parts of the said pipelines left on the seabed during the period of construction shall be covered in such a<br />
way that they will not interfere with fishing gear;<br />
The pipelines shall be suitably protected to ensure that they are not susceptible to third party damage;<br />
The pipelines shall possess such negative buoyancy as may be required for them to remain stable where placed<br />
on the sea floor;<br />
An effective leak detection system shall be installed;<br />
Consent shall be obtained from the placement of rock and concrete mattresses for burying, protecting or<br />
supporting the pipeline and conditions may be attached to that consent;<br />
No object, equipment or material of any kind which is not an integral part of the pipeline shall be disposed of at<br />
sea or abandoned on the seabed during the construction and installation of the pipelines. Where such items<br />
A ‐ 7