Balloch Field Development <strong>Environmental</strong> <strong>Statement</strong><br />

Section 2 Proposed Development<br />

Option 2 ‐ Long (~1.7 km) step out from DC2 with cooling spool<br />

Similar to Option 1, Option 2 involves the Balloch fluids being commingled with that of Donan and<br />

Lochranza at the existing DC2 production manifold. Again, the fluids will be transported to the GPIII<br />

FPSO via the existing PL2662 13½ ” production flowline. This option also involves the installation of<br />

subsea cooling spools. In this option the production wells would be located above the Balloch<br />

reservoir, approximately 1.7 km from the DC2 manifold (Figure 2‐6). This development option would<br />

facilitate any future tie‐in to any other Balloch flowline installed at a later date.<br />

Figure 2‐6 Balloch development Option 2.<br />

2‐7