Balloch Field Development <strong>Environmental</strong> <strong>Statement</strong><br />

Standard Information Sheet<br />

STANDARD INFORMATION SHEET<br />

Project name Balloch Field Development <strong>Environmental</strong> <strong>Statement</strong><br />

Development Location Block 15/20a<br />

Licence No. P.1041<br />

Project Reference Number D/4126/2011<br />

Type of Project Field Development<br />

Undertaker <strong>Maersk</strong> <strong>Oil</strong> UK Limited<br />

Crawpeel Road, Altens, Aberdeen<br />

AB12 3LG<br />

Licensees/Owners <strong>Maersk</strong> <strong>Oil</strong> UK Ltd (100%)<br />

Short Description <strong>Maersk</strong> <strong>Oil</strong> propose to develop the Balloch field as a subsea tieback to<br />

the Global Producer III FPSO which currently handles production from<br />

the Donan and Lochranza fields. The Balloch wells will be connected<br />

to the existing Donan DC2 production manifold utilising available<br />

production slots. The proposed Balloch field development will initially<br />

consist of the drilling of an appraisal well with a sidetrack production<br />

well (Phase I). Depending on the success of the initial well, up to two<br />

further production wells may be drilled (Phase II). This will be<br />

supported by the additional information from the appraisal well and<br />

the initial Balloch production to optimise any system modifications.<br />

Subsea infrastructure tying the wells back to the Donan DC2<br />

production manifold will also be installed as part of the proposed<br />

development. The DC2 manifold is currently tied back to the GPIII. <strong>Oil</strong><br />

will be exported from GPIII to shore by tanker and gas will be exported<br />

via the North Sea Producer FPSO for onward transport to the Frigg<br />

pipeline.<br />

Key Dates Activities Date<br />

Significant <strong>Environmental</strong><br />

Effects Identified<br />

Drilling and completion November ‐ December 2012<br />

Subsea installation January 2013 – April 2013<br />

Commissioning April 2013<br />

First <strong>Oil</strong> Q3 2013<br />

None identified.<br />

<strong>Statement</strong> Prepared by <strong>Maersk</strong> <strong>Oil</strong> UK Limited, Genesis and Senergy Development Solutions.<br />