2 ‐ 20<br />

Balloch Field Development <strong>Environmental</strong> <strong>Statement</strong><br />

Section 2 Proposed Development<br />

A DSV will be used to lay the jumpers, umbilicals and cooling spools. The mattresses and grout bags<br />

will also be put in place using the DSV. No additional vessels will be required as the support and<br />

guard vessels associated with the GPIII FPSO will meet the requirements of the DSV.<br />

2.5.11. FLOW ASSURANCE<br />

Flow assurance refers to the successful flow of hydrocarbons from the reservoir to the processing<br />

facilities. It involves effectively handling many solid deposits such as gas hydrates, scaling, sand, wax,<br />

etc. Flow assurance and operability are supported by methanol for the inhibition of hydrates at start<br />

up and shut down, by pipe insulation and chemical injection for the management of wax and by<br />

chemical injection for the management of other production chemistry issues.<br />

The chemical injection requirements for Balloch are the same as for Donan and Lochranza and are<br />

expected to include:<br />

Hydrate inhibitor Corrosion inhibitor<br />

Scale inhibitor Demulsifier<br />

Antifoam Deoiler<br />

Wax inhibitor Acetic acid<br />

Biocide (batch chemical) Anti asphaltene.<br />

There will be an incremental increase in chemicals used on the FPSO to process the Balloch<br />

hydrocarbons. Details of these will be provided in the subsequent PON15s and changes to the<br />

PON15D for the GPIII FPSO.<br />

2.6. FPSO FACILITY<br />

The GPIII FPSO is located approximately 2.5 km south west of the proposed Balloch development and<br />

currently handles production from the Donan and Lochranza fields.<br />

The GPIII has topside areas dedicated for future facilities and therefore little modification is needed to<br />

accommodate the proposed Balloch development. Details of the FPSO, including storage capacity,<br />

are provided in Table 2‐14. The vessel layout can be seen in Figure 2‐12.<br />

Storage Capacity<br />

Table 2‐14 Details of the GPIII FPSO.<br />

Description Value<br />

Length 200 m<br />

Beam 38 m<br />

Depth 23 m<br />

Draft 17 m<br />

Accommodation 95 personnel<br />

Crude oil 81,064 m 3<br />

Ballast 36,872 m 3<br />

Fuel oil 1,725 m 3<br />

Fresh water 430 m 3<br />

Slops 5,650 m 3