Balloch Field Development <strong>Environmental</strong> <strong>Statement</strong><br />
Section 2 Proposed Development<br />
A DSV will be used to lay the jumpers, umbilicals and cooling spools. The mattresses and grout bags<br />
will also be put in place using the DSV. No additional vessels will be required as the support and<br />
guard vessels associated with the GPIII FPSO will meet the requirements of the DSV.<br />
2.5.11. FLOW ASSURANCE<br />
Flow assurance refers to the successful flow of hydrocarbons from the reservoir to the processing<br />
facilities. It involves effectively handling many solid deposits such as gas hydrates, scaling, sand, wax,<br />
etc. Flow assurance and operability are supported by methanol for the inhibition of hydrates at start<br />
up and shut down, by pipe insulation and chemical injection for the management of wax and by<br />
chemical injection for the management of other production chemistry issues.<br />
The chemical injection requirements for Balloch are the same as for Donan and Lochranza and are<br />
expected to include:<br />
Hydrate inhibitor Corrosion inhibitor<br />
Scale inhibitor Demulsifier<br />
Antifoam Deoiler<br />
Wax inhibitor Acetic acid<br />
Biocide (batch chemical) Anti asphaltene.<br />
There will be an incremental increase in chemicals used on the FPSO to process the Balloch<br />
hydrocarbons. Details of these will be provided in the subsequent PON15s and changes to the<br />
PON15D for the GPIII FPSO.<br />
2.6. FPSO FACILITY<br />
The GPIII FPSO is located approximately 2.5 km south west of the proposed Balloch development and<br />
currently handles production from the Donan and Lochranza fields.<br />
The GPIII has topside areas dedicated for future facilities and therefore little modification is needed to<br />
accommodate the proposed Balloch development. Details of the FPSO, including storage capacity,<br />
are provided in Table 2‐14. The vessel layout can be seen in Figure 2‐12.<br />
Storage Capacity<br />
Table 2‐14 Details of the GPIII FPSO.<br />
Description Value<br />
Length 200 m<br />
Beam 38 m<br />
Depth 23 m<br />
Draft 17 m<br />
Accommodation 95 personnel<br />
Crude oil 81,064 m 3<br />
Ballast 36,872 m 3<br />
Fuel oil 1,725 m 3<br />
Fresh water 430 m 3<br />
Slops 5,650 m 3