1.6.2. ADDITIONAL PRODUCTION WELL(S)<br />

1 ‐ 6<br />

Balloch Field Development <strong>Environmental</strong> <strong>Statement</strong><br />

Section 1 Introduction<br />

Dependent upon the results of the first production well, further wells may be drilled into the Balloch<br />

field. A maximum of three development wells are anticipated although the ultimate number of wells<br />

will depend on production performance. The EIA considers drilling one appraisal/production well and<br />

up to two additional production wells. Should additional production wells be required, <strong>Maersk</strong> <strong>Oil</strong> will<br />

consult with DECC on the appropriate consenting route for additional drilling at the Balloch field.<br />

1.6.3. FIELD LIFE<br />

Production is expected to commence from the Balloch field in 2013 and is expected to last to the end<br />

of 2019, although the final date of COP could be as late as 2026 if the field life of the GPIII is extended<br />

via infill well drilling and tiebacks thus allowing the Balloch field to continue producing .<br />

1.7. CONSULTATION PROCESS<br />

DECC were consulted on the proposed development with all consultation having been verbal with the<br />

<strong>Environmental</strong> Management Team. At the consultation stage, DECC raised no concerns over the<br />

proposed Balloch development. No other organisations were directly consulted on the proposed<br />

development.