29.03.2013 Views

Proceedings of the International Cyanide Detection Testing Workshop

Proceedings of the International Cyanide Detection Testing Workshop

Proceedings of the International Cyanide Detection Testing Workshop

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Field test kit. BFAR recognizes <strong>the</strong><br />

inadequacies <strong>of</strong> <strong>the</strong> current method employed<br />

and more importantly <strong>the</strong> need for cyanide<br />

testing for regulatory purposes. BFAR is<br />

open to collaborative work in particularly in<br />

<strong>the</strong> investigations <strong>of</strong> methods for cyanide<br />

detection. In <strong>the</strong> past, BFAR, MAC and<br />

Merck jointly conducted a comparative study<br />

between a methods developed by Merck. The<br />

development <strong>of</strong> a method particularly ideal<br />

for fi eld use will be benefi cial to BFAR.<br />

Alternative livelihood for displaced<br />

fishermen. Possible alternative sources <strong>of</strong><br />

income are necessary to wean fi shers from<br />

cyanide fi shing. Fishermen resort to this<br />

destructive fi shing method due to a complex<br />

set <strong>of</strong> issues, i.e. poverty, easy cash returns at<br />

less capital, etc.<br />

Sustainable Financing<br />

Maintenance & operation per lab per annum<br />

Chemicals 200,000.00<br />

Laboratory supplies 100,000.00<br />

Offi ce supplies 30,000.00<br />

Labor Services (1 chemist, 2 lab assistants) 500,000.00<br />

Utility bills/expenses 125,000.00<br />

Total: PhP 955,000.00<br />

US$ 23,507.11*<br />

(*US$1.00 = PhP 40.626 01 Feb 08 exchange rate, www.bsp.gov.ph)<br />

Finances<br />

In <strong>the</strong> establishment <strong>of</strong> <strong>the</strong> laboratory:<br />

New structure:<br />

Per Laboratory 900,000.00<br />

If structure is to be rented<br />

Renovation (fi t for lab) 100,000.00<br />

Rent (Manila rate) per month 75,000.00<br />

Conduct <strong>of</strong> nationwide training (regulatory and fi sherfolk) 1, 000, 000.00<br />

Production <strong>of</strong> IEC materials 500, 000.00<br />

Total PhP 1, 500, 000.00<br />

138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!