19.05.2013 Views

Chapter 1 - Caltrans - State of California

Chapter 1 - Caltrans - State of California

Chapter 1 - Caltrans - State of California

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Chapter</strong> 3 Comments and Coordination<br />

Table 2.2-5 Summary <strong>of</strong> MSAT Emissions for Year 2016 (in grams per day)<br />

Alternatives<br />

Alt # 1 (No-BUILD)<br />

Alt # 2 (Minimum<br />

Standard Part-Time<br />

HOV lane)<br />

Alt # 3 (Full Standard<br />

Part-Time HOV lane)<br />

Time Period<br />

Truck %<br />

Total VMT<br />

Diesel PM<br />

MF<br />

Peak 7.3 203,244 635 477 105 547 24 157<br />

Only<br />

Off-Pk 12.6 221,778 1,346 788 159 781 36 273<br />

MF<br />

HOV<br />

MF<br />

HOV<br />

Source The Department’s Air Quality Study April 2008<br />

Formaldehyde<br />

Peak 9.2 162,906 661 452 96 488 22 152<br />

Off-Pk 12.6 221,778 1,346 788 159 781 36 273<br />

Peak 0 40,338 24 105 30 144 7 29<br />

Off-Pk N/A; HOV lane in operation during peak periods only<br />

Peak 9.2 162,906 661 452 96 488 22 152<br />

Off-Pk 12.6 221,778 1,346 788 159 781 36 273<br />

Peak 0 40,338 24 105 30 144 7 29<br />

Off-Pk N/A; HOV lane in operation during peak periods only<br />

Table 2.2-6 Summary <strong>of</strong> MSAT Emissions for Horizon Year 2036 (grams per day)<br />

Alternatives<br />

Alt # 1 (No-BUILD)<br />

Alt # 2 (Minimum<br />

Standard Part-Time<br />

HOV lane)<br />

Alt # 3 (Full Standard<br />

Part-Time HOV lane)<br />

Time Period<br />

Truck %<br />

Total VMT<br />

Diesel PM<br />

MF<br />

Peak 7.3 258,306 399 286 53 305 12 103<br />

Only<br />

Off-Pk 6.3 281,850 422 381 90 442 21 122<br />

MF<br />

HOV<br />

MF<br />

HOV<br />

Source The Department’s Air Quality Study April 2008<br />

Formaldehyde<br />

Peak 9.2 207,042 395 261 54 277 12 90<br />

Off-Pk 6.3 281,850 453 462 114 541 26 144<br />

Peak 0 51,264 15 76 22 101 5 21<br />

Off-Pk N/A; HOV lane in operation during peak periods only<br />

Peak 9.2 207,042 395 261 54 277 12 90<br />

Off-Pk 6.3 281,850 453 462 114 541 26 144<br />

Peak 0 51,264 15 76 22 101 5 21<br />

Off-Pk N/A; HOV lane in operation during peak periods only<br />

154 IS/EA VEN-SB US101 HOV Project<br />

Butadiene<br />

Butadiene<br />

Benzene<br />

Benzene<br />

Acrolein<br />

Acrolein<br />

Acetaldehyde<br />

Acetaldehyde

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!