Chapter 1 - Caltrans - State of California
Chapter 1 - Caltrans - State of California
Chapter 1 - Caltrans - State of California
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Impact Avoidance or Minimization Measure<br />
Mitigation Measure<br />
determined eligible for the purposes <strong>of</strong> this<br />
undertaking), and that an archaeological monitor<br />
be present during any ground disturbing activities.<br />
Should any cultural resources be encountered<br />
during construction, all work in the area <strong>of</strong> the<br />
discovery must stop until the on-site monitor can<br />
evaluate the nature and significance <strong>of</strong> the find.<br />
PHYSICAL ENVIRONMENT<br />
Water Quality and Stormwater<br />
Run<strong>of</strong>f<br />
Avoidance and minimization measures for storm<br />
water are accomplished by implementation <strong>of</strong><br />
approved Best Management Practices (BMPs),<br />
which are generally broken down into four<br />
categories: Pollution Prevention, Treatment,<br />
Construction, and Maintenance BMPs. The<br />
Department’s Storm Water Program contains<br />
guidance for implementation <strong>of</strong> each <strong>of</strong> these<br />
BMPs. Certain projects may require installation<br />
and maintenance <strong>of</strong> permanent controls to treat<br />
storm water. Selection and design <strong>of</strong> permanent<br />
project BMPs is refined as the project progresses<br />
through the planning stage and into final design.<br />
Construction Site BMPs for this project shall<br />
include the following categories:<br />
Soil stabilization Practices<br />
Sedimentation Control Practices<br />
Tracking Control Practices<br />
Wind Erosion Controls<br />
Non-Storm Water Controls<br />
Waste Management and Materials Pollution<br />
Controls<br />
Street Sweeping and Vacuuming, Storm Drain<br />
Inlet Protection, Wind Erosion Control, Noise<br />
Pollution Control, Water Conservation Practices,<br />
Paving and Grinding Operation, Illicit<br />
Connection/Illegal Discharge Detection and<br />
Reporting, Vehicle and Equipment Fueling,<br />
Concrete Curing, Concrete Finishing, Material<br />
Delivery and Storage, Material Use, Stockpile<br />
Management, Concrete Waste Management, Spill<br />
Prevention and Control, Solid Waste<br />
Management, Contaminated Soil Management,<br />
Concrete Waste Management, Sanitary/Septic<br />
Implementation<br />
Phase<br />
Final Design/<br />
Construction<br />
IS/EA VEN-SB US101 HOV Project 251<br />
Appendix E Minimization and/or Mitigation Summary<br />
Implementing<br />
Department<br />
Monitoring/Reporting<br />
Agency/Department<br />
Design/ Construction Construction/<br />
Environmental Planning/<br />
Regional Water Quality<br />
Control Board