State Planning Policy 2/07 Guideline - Queensland Mining and Safety
State Planning Policy 2/07 Guideline - Queensland Mining and Safety
State Planning Policy 2/07 Guideline - Queensland Mining and Safety
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
100<br />
KHOLO SANDS KEY RESOURCE AREA – KRA 80<br />
LOCAL GOVERNMENT AREA: Brisbane City <strong>and</strong> Ipswich City<br />
LOCATION:<br />
The resource is located upstream of the Kholo Bridge on the Brisbane River about<br />
10 kilometres north of the Warrego Highway (see map KRA 80).<br />
EXTRACTIVE RESOURCE: S<strong>and</strong>, Soil, Gravel<br />
EXTRACTIVE RESOURCE DESCRIPTION:<br />
The resource consists of fine to coarse grained s<strong>and</strong> <strong>and</strong> gravel beneath topsoil <strong>and</strong> loam<br />
overburden. It occupies over 30 hectares of an alluvial terrace of the Brisbane River. The<br />
resource is currently being worked.<br />
SIGNIFICANCE:<br />
The resource is capable of supplying the southwest Brisbane <strong>and</strong> Ipswich markets for<br />
concrete <strong>and</strong> bituminous aggregate for over 10 years, as well as for the topsoil <strong>and</strong> loam<br />
market.<br />
SEPARATION AREA:<br />
A separation distance of 200 metres from the resource boundary surrounds the resource to the<br />
north, east <strong>and</strong> south, as all l<strong>and</strong> is within rural zoning. The separation area to the west is<br />
constrained to the western (right) bank of the Brisbane River.<br />
TRANSPORT ROUTE:<br />
S<strong>and</strong> is transported southward along Kholo Road to the Warrego Highway.<br />
SPECIAL CONSIDERATIONS:<br />
The KRA is situated on the eastern side of the Brisbane River on Kholo Road. A minimum<br />
buffer width of 40 metres has been established from the resource/processing area to the river.<br />
<strong>State</strong> <strong>Planning</strong> <strong>Policy</strong> 2/<strong>07</strong> <strong>Guideline</strong>