22.07.2013 Views

State Planning Policy 2/07 Guideline - Queensland Mining and Safety

State Planning Policy 2/07 Guideline - Queensland Mining and Safety

State Planning Policy 2/07 Guideline - Queensland Mining and Safety

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A. Devising appropriate assessment measures to achieve the <strong>Policy</strong> outcome:<br />

Type of development made<br />

assessable or self-assessable<br />

Resource/Processing Area –<br />

to material change of use <strong>and</strong><br />

reconfiguring a lot.<br />

Specific outcomes Solutions Comments<br />

1. The long term<br />

availability of the<br />

extractive resource<br />

for extraction or<br />

processing is<br />

maintained.<br />

2. Development in the<br />

resource/processing<br />

area avoids or<br />

mitigates adverse<br />

impacts on areas of<br />

state or regional<br />

biodiversity<br />

significance.<br />

1.1 Development is for extractive<br />

industry or directly associated<br />

with extractive industry; or<br />

1.2 Development is for other uses<br />

that would not constrain<br />

existing or future extractive<br />

activities; or<br />

1.3 Development is for a<br />

temporary use.<br />

<strong>State</strong> <strong>Planning</strong> <strong>Policy</strong> 2/<strong>07</strong> <strong>Guideline</strong><br />

Note for 1.2: Other development that wouldn’t constrain<br />

existing or future extractive industries could include nonintensive<br />

agricultural uses including forestry or other uses that<br />

involve minimum capital investment.<br />

Note for 1.3 Temporary uses could include uses that are short<br />

term in nature such as recreational uses. The applicant will be<br />

expected to demonstrate to the satisfaction of the assessment<br />

manager that the use would operate on a temporary basis.<br />

2.1 No solution provided. Note for 2.1: Applications will be assessed on a case-by-case<br />

basis. The applicant will be expected to demonstrate to the<br />

satisfaction of the assessment manager <strong>and</strong> any concurrence<br />

agency that a specific extractive industry application can<br />

achieve the specific outcome.<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!