INNES PARK KEY RESOURCE AREA – KRA 87<br />

LOCAL GOVERNMENT AREA: Burnett Shire<br />

LOCATION:<br />

The resource is located on Back Windermere Road, about 8 kilometres south of Bargara (see<br />

map KRA 87).<br />

EXTRACTIVE RESOURCE: Quarry Rock<br />

EXTRACTIVE RESOURCE DESCRIPTION:<br />

The resource comprises part of the basalt that underlies the coastal plain between Burnett<br />

Heads <strong>and</strong> Elliott Heads.<br />

An existing quarry supplies aggregates to a concrete batching plant in Bundaberg. A small<br />

proportion of the material is sold to other customers.<br />

SIGNIFICANCE:<br />

The remaining resource is sufficient for over 30 years of supply. The resource supplies a<br />

large proportion of the aggregates for the Bundaberg district.<br />

SEPARATION AREA:<br />

North <strong>and</strong> northwest of the resource/processing area, the separation area excludes the<br />

Residential C zoned l<strong>and</strong> west of Back Windemere Road <strong>and</strong> the Residential A zoned l<strong>and</strong> on<br />

the southern side of Innes Park Road. The flat country to the east of the resource is zoned<br />

Future Urban. This is partly shielded by a bund wall constructed along the perimeter of the<br />

extractive operations, allowing a reduction in separation distance to 500 metres. The Special<br />

Facilities zone, however, is excluded from this part of the separation area.<br />

The separation area boundary has been defined at 500 metres from quarry operations over the<br />

Rural <strong>and</strong> Future Urban l<strong>and</strong> south <strong>and</strong> west of the existing quarry, as these areas are also<br />

partly shielded by the bund wall.<br />

TRANSPORT ROUTE:<br />

From the quarry entrance on Back Windermere Road, most quarry product is transported<br />

north to the <strong>State</strong>-controlled Innes Park Road. Some product is hauled south via Barolin<br />

Homestead Road to Elliott Heads Road.<br />

<strong>State</strong> <strong>Planning</strong> <strong>Policy</strong> 2/<strong>07</strong> <strong>Guideline</strong><br />

1<strong>07</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!