- Page 1 and 2:
Available on CMS information server
- Page 3 and 4:
Abstract This technical proposal ai
- Page 5 and 6:
5.3 Simulated chamber properties .
- Page 7 and 8:
List of Figures 1 CMS transverse se
- Page 9 and 10:
49 Simulated total L1 GEM+RPC trigg
- Page 11 and 12:
List of Tables 1 Performance requir
- Page 13 and 14:
obtained. The angular resolution is
- Page 15 and 16:
of the gas rigidity or discharge. S
- Page 17 and 18:
Figure 3: CATIA model of the CMS en
- Page 19 and 20:
Therefore, the physics case for add
- Page 21 and 22:
(r.m.s.) p /p T T ∆ (r.m.s.) T /p
- Page 23 and 24:
3 Studies of small and full-scale G
- Page 25 and 26:
Figure 11: Positions of small Tripl
- Page 27 and 28:
Figure 16: VFAT2 threshold scan for
- Page 29 and 30:
(a) (b) Figure 19: (a) Exploded vie
- Page 31 and 32:
(a) (b) Figure 22: (a) The GE1/1-I
- Page 33 and 34:
Figure 27: GE1/1-II efficiency perf
- Page 35 and 36:
instrumented with GEMs, the number
- Page 37 and 38:
Table 3: Performance overview for a
- Page 39 and 40:
Figure 34: Exploded view of a Tripl
- Page 41 and 42:
Figure 37: Lorentz angles for the g
- Page 43 and 44:
Figure 40: Loss rate for secondary
- Page 45 and 46:
Figure 44: Triple-GEM effective gai
- Page 47 and 48:
Figure 46: Longitudinal view of the
- Page 49 and 50:
Figure 47: Simulated L1 GEM+RPC tri
- Page 51 and 52:
Figure 49: Simulated total L1 GEM+R
- Page 53 and 54:
Ideal Realistic Ideal Realistic Ide
- Page 55 and 56: Ideal Realistic Ideal Realistic Ide
- Page 57 and 58: Figure 56: TIF gas system. 5.6 Prod
- Page 59 and 60: 6 Electronics system 6.1 Introducti
- Page 61 and 62: ates and the need for compatibility
- Page 63 and 64: GdSP Preamp Shaper 64 or 128 channe
- Page 65 and 66: algorithm, the GemTBs input data ba
- Page 67 and 68: Table 6: Power estimate for the mai
- Page 69 and 70: Cost for components for 3·10 chamb
- Page 71 and 72: 7 Cooling, gas and cabling services
- Page 73 and 74: Figure 71: Layout of the pump compr
- Page 75 and 76: Figure 74: Endcap cooling system, m
- Page 77 and 78: CMS Triple-GEM production GE1/1 foi
- Page 79 and 80: Table 18: Budget and resources base
- Page 81 and 82: A twiki page (https://twiki.cern.ch
- Page 83 and 84: 12 Publications 2010 2011 1. Charac
- Page 85 and 86: References [1] S. Chatrchyan et al.
- Page 87 and 88: Appendices 84
- Page 89 and 90: Table 22: GE2/1 Mechanics GE2/1long
- Page 91 and 92: Table 28: System overview: Endcap 4
- Page 93 and 94: Notice that pivot and feet must bot
- Page 95 and 96: C.4 Product(s) involved 1. GE 1/1 S
- Page 97 and 98: Ideal Realistic Ideal Realistic Ide
- Page 99 and 100: Ideal Realistic Ideal Realistic Ide
- Page 101 and 102: Ideal Realistic Ideal Realistic Ide
- Page 103 and 104: Ideal Realistic Ideal Realistic Ide
- Page 105: Ideal Realistic Ideal Realistic Ide