18.08.2013 Views

A GEM Detector System for an Upgrade of the CMS Muon Endcaps

A GEM Detector System for an Upgrade of the CMS Muon Endcaps

A GEM Detector System for an Upgrade of the CMS Muon Endcaps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A Parameters describing <strong>the</strong> GEi/1 systems<br />

In this appendix we describe <strong>the</strong> parameters <strong>of</strong> <strong>the</strong> two proposed stations GE1/1 <strong>an</strong>d GE2/1 in terms <strong>of</strong> mech<strong>an</strong>ics,<br />

electronics <strong>an</strong>d technical specification <strong>of</strong> services.<br />

Table 19: GE1/1 Mech<strong>an</strong>ics<br />

Long side 440mm<br />

Short side 220mm<br />

Height 990mm<br />

Area 0.32m 2<br />

Chamber volume 2.2869l<br />

Super Chamber volume 4.57l<br />

Gas flow per chamber 0.48l/h<br />

Table 20: GE1/1 Electronics<br />

Eta partition 10<br />

Phi columns 3<br />

Chamber consumption (VFAT) 34W<br />

Chamber consumption (GdSP) 51W<br />

Total chips 30VFATs<br />

Ch<strong>an</strong>nels per chamber 3840ch<br />

Ch<strong>an</strong>nels per super chamber 7680ch<br />

Area/chips 10.89·10 −3 m 2 /chip<br />

Consumption/ch<strong>an</strong>nel (VFAT) 8.85·10 −3 W/ch<strong>an</strong>nel<br />

Consumption/ch<strong>an</strong>nel (GdSP) 13.28·10 −3 W/ch<strong>an</strong>nel<br />

Table 21: GE1/1 <strong>System</strong> overview<br />

Surface 23.5224m 2<br />

Gas volume 165l<br />

Electronics ch. 276480ch<br />

Power consumption (VFAT) 2.448kW<br />

Power consumption (GdSP) 3.672kW<br />

85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!