18.08.2013 Views

A GEM Detector System for an Upgrade of the CMS Muon Endcaps

A GEM Detector System for an Upgrade of the CMS Muon Endcaps

A GEM Detector System for an Upgrade of the CMS Muon Endcaps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

49 Simulated total L1 <strong>GEM</strong>+RPC trigger output rates as function <strong>of</strong> different geometries <strong>for</strong> ideal<br />

(left) <strong>an</strong>d realistic (right) chamber models. Rows correspond to three differentpT thresholds <strong>of</strong> 16,<br />

50, <strong>an</strong>d 140 GeV<br />

c . Only <strong>the</strong> contribution from muon c<strong>an</strong>didates <strong>of</strong> quality 1 or 2 is shown. . . . . . 48<br />

50 L1 <strong>GEM</strong>+RPC trigger efficiency curves in trigger tower 13 <strong>for</strong> base geometry. Rows correspond<br />

to 3 different pT thresholds <strong>of</strong> 16, 50, <strong>an</strong>d 140 GeV<br />

c , respectively. Left column shows results <strong>for</strong><br />

ideal chamber model, right <strong>for</strong> realistic chamber model. . . . . . . . . . . . . . . . . . . . . . . . 49<br />

51 L1 <strong>GEM</strong>+RPC trigger efficiency curves in trigger tower 13 <strong>for</strong> 2× geometry. Rows correspond to<br />

3 differentpT thresholds <strong>of</strong> 16, 50, <strong>an</strong>d 140 GeV<br />

c , respectively. Left column shows results <strong>for</strong> ideal<br />

chamber model, right <strong>for</strong> realistic chamber model. . . . . . . . . . . . . . . . . . . . . . . . . . . 50<br />

52 L1 <strong>GEM</strong>+RPC trigger efficiency curves in trigger tower 13 <strong>for</strong> 4× geometry. Rows correspond to<br />

3 differentpT thresholds <strong>of</strong> 16, 50, <strong>an</strong>d 140 GeV<br />

c , respectively. Left column shows results <strong>for</strong> ideal<br />

chamber model, right <strong>for</strong> realistic chamber model. . . . . . . . . . . . . . . . . . . . . . . . . . . 51<br />

53 L1 <strong>GEM</strong>+RPC trigger efficiency curves in trigger tower 13 <strong>for</strong> 8× geometry. Rows correspond to<br />

3 differentpT thresholds <strong>of</strong> 16, 50, <strong>an</strong>d 140 GeV<br />

c , respectively. Left column shows results <strong>for</strong> ideal<br />

chamber model, right <strong>for</strong> realistic chamber model. . . . . . . . . . . . . . . . . . . . . . . . . . . 52<br />

54 Building 186 view. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53<br />

55 TIF cle<strong>an</strong> room view. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53<br />

56 TIF gas system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54<br />

57 New building 107. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54<br />

58 Block diagram showing <strong>the</strong> main components <strong>of</strong> <strong>an</strong> electronic control <strong>an</strong>d readout system suitable<br />

<strong>for</strong> <strong>GEM</strong>s within <strong>CMS</strong>. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56<br />

59 Strip dimensions <strong>for</strong> <strong>GEM</strong> prototype GE1/1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57<br />

60 The electrical characteristics <strong>of</strong> <strong>GEM</strong> prototype GE1/1. . . . . . . . . . . . . . . . . . . . . . . . 57<br />

61 VFAT2, A 128 ch<strong>an</strong>nel front-end ASIC with trigger <strong>an</strong>d tracking capabilities. This ASIC is currently<br />

used <strong>for</strong> <strong>the</strong> prototype systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58<br />

62 The VFAT2 architecture, shown <strong>for</strong> 1 ch<strong>an</strong>nel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58<br />

63 VFAT3 architecture. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59<br />

64 Gdsp architecture. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60<br />

65 Off-detector Electronics option using <strong>the</strong> current RPC PAC trigger. . . . . . . . . . . . . . . . . . 61<br />

66 Off-detector Electronics option using new AMC <strong>GEM</strong> Trigger Boards (GemTB). . . . . . . . . . 61<br />

67 Block diagram <strong>for</strong> <strong>the</strong> electronics system (control <strong>an</strong>d readout) as <strong>for</strong>eseen <strong>for</strong> <strong>the</strong> <strong>CMS</strong> <strong>for</strong>ward<br />

high-η region. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62<br />

68 The <strong>GEM</strong> segmentation into columns <strong>an</strong>d eta partitions. . . . . . . . . . . . . . . . . . . . . . . . 63<br />

69 Time line <strong>for</strong> <strong>the</strong> front-end ASIC development <strong>an</strong>d readout systems. . . . . . . . . . . . . . . . . 65<br />

70 Layout <strong>of</strong> <strong>the</strong> mixer unit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68<br />

71 Layout <strong>of</strong> <strong>the</strong> pump compressor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70<br />

72 Layout <strong>of</strong> <strong>the</strong> gas distribution rack. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71<br />

73 Endcap cooling system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71<br />

74 Endcap cooling system, main m<strong>an</strong>ifolds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72<br />

75 Endcap cooling system layout. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72<br />

76 Schedule <strong>an</strong>d milestone <strong>for</strong> GE1/1 <strong>an</strong>d GE2/1, construction, installation <strong>an</strong>d project. . . . . . . . . 74<br />

77 Current org<strong>an</strong>igram <strong>of</strong> <strong>the</strong> proto-collaboration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!